PRATYUSH K. CHATURVEDI
MOBILE: +62 89654575221
pratyush.chaturvedi@yahoo.co.in
Career Objective:
To contribute my technical expertise in the field of planning and project control management in Oil& Gas.
Academic Qualifications:
B.Tech (2006) with First Division from Babu Banarsi Das Institute of Technology Ghaziabad Uttar Pradesh (India) affiliated from Uttar Pradesh Technical University Lucknow, Uttar Pradesh (India).
Total Experience: - 7 Years 4 Months
Currently working in Pt-Timas Suplindo, Jakarta, Indonesia as a Lead Project Control Engineer from 26th June 2013 to till date and looking after the project in Jakarta, Indonesia.
Organizational Experience:-
Current Job Profile:-
Ø Responsible for updating different level schedules including Project Baseline,Engineering, Procurement, Construction and Installation.
Ø Development of Detail Marine Spread, Vessel Utilization Plan, Offshore pre-mobilization check list, and transportation plan.
Ø Preparation of Fabrication Measurement sheet, Installation Measurement Sheet and S-Curve for E, P, C, I & Fabrication and monthly updating.
Ø Preparation of Weekly progress report (WPR), monthly progress report (MPR).
Ø Visiting fabrication yard and offshore installation sites for coordinating with the Construction team for preparation of working plans, resources required and potential delays.
Ø Preparation of Client Billing and provide the necessary back up and calculation to the client.
Ø Prepare the Bi-Weekly report for management review.
Ø Looking after the Contractual issues to push up the Contract department.
Ø Providing necessary details, data, history of events and working with Contracts department for preparation of Claims for Cost and schedule impact.
Project Handled:-
Ø In Tmias Suplindo: - Lima Subsidence Remediation Project-Deck Raising of the (LCOM, LSER, LPRO, LA Platform) & Installation of Lifting Frame on TRIPOD South (A) & TRIPOD North (B).
Ø In Punjlloyd: - Working as Senior Planning Engineer, Jakarta, Indonesia (September 2011 to 25th June 2013).
Ø In Punjlloyd :-Strategic Gas Transmission Pipe Line Project, Doha, Qatar: Jan 2009 to Sep 2010
Ø In Punjlloyd :-East West Gas Pipe Line Project, Valsad, Gujarat (India): Aug 2007 to Dec 2008
Ø In punjlloyd :- Dahej Uran Pipe Line Project, Bharuch, Gujarat (India): Jan 2007 to 13th Aug 2007
Ø In Punjlloyd :- Mumbai Manmad Mangalya Pipe Line Project, (India): 13th Aug 2006 to 13th Jan 2007
Professional Experience: -
PT.PERTAMINA HULU ONWJ STC-0558, 3-NUIs Platform and Pipeline Installation project-Jakarta, Indonesia (September 2012 to 25th June 2013).
Ø Responsible for updating the level 2, 3, 4 schedules including Project Baseline,engineering, Procurement, Construction and Installation.
Ø Updating the Master document register, Procurement Control Sheet, Manning Histogram and controlling the activities.
Ø Preparation of S-Curve for E, P, C, I and monthly updating.
Ø Preparation of Weekly progress report (WPR), monthly progress report (MPR) and Monthly Review presentation.
Ø Preparation of Client Billing and provide the necessary back up and calculation to the client.
Ø Coordination with Civil, Mechanical, Electrical & Instrumentation department for engineering planning.
Ø Preparation of Budget, cost to completion and cash flow analysis.
Ø Prepare the Cost Control report and Cash Flow analysis, SBU, MD report for management review.
Ø Subcontractor billing and Expediting for payments.
Ø Looking after the Contractual issues to push up the Contract department.
Ø Identifying potential delays, analyzing and issuing proposed corrective actions as required.
Ø Providing necessary details, data, history of events and working with Contracts department for preparation of Claims for Cost and schedule impact.
Strategic Gas Transmission Pipe Line Project, Doha, Qatar:Jan 2009 to Sep 2010
36’’ diameter gas pipeline of Qatar Petroleum. Having four different walls thickness in a stretch of 211km.
Responsibilities:
Ø Monitoring and scheduling of project using Primavera software (P3 version)/MS Project.
Ø Responsible for assessing and monitoring the project budgeting and costing.
Ø Coordination with Civil, Mechanical, Electrical & Instrumentation department for engineering planning.
Ø Making the PO’s (Purchase Order) as required by the project specification using Oracle 11i version.
Ø Client Billing, Sub Contractor’s / Vendor’s Billing
Ø Issuing LOI and Work order for the project.
Ø Monitoring Cash Flow and Project Progress for Management review.
East West Gas Pipe Line Project, Valsad, Gujarat (India): Aug 2007 to Dec 2008
48’’ diameter gas pipeline of Reliance Gas Transportation Infrastructure Ltd. having three different walls Thickness in a stretch of 185.4 km. Majority of the line will be done by automatic welding process of PWT, Italy and the remaining is of semi automatic welding process.
Responsibilities:
Ø Monitoring and scheduling of project using Primavera software (P3 version)/MS Project.
Ø Responsible for assessing and monitoring the project budgeting and costing.
Ø Coordination with Civil, Mechanical, Electrical & Instrumentation department for engineering planning.
Ø Making the PO’s (Purchase Order) as required by the project specification using Oracle 11i version.
Ø Client & Sub Contractor’s billing.
Ø Issuing LOI and Work order for the project.
Ø Monitoring Cash Flow and Project Progress for Management review.
Dahej Uran Pipe Line Project, Bharuch, Gujarat (India): Jan 2007 to 13th Aug 2007
30” diameter gas pipe line of GAIL INDIA Ltd. Contains three different wall thicknesses in a stretch of 142 km.Majority of the line will be done by automatic welding process of PWT, Italy and the remaining is of semi automatic welding process.
Responsibilities:
Ø Monitoring and scheduling of project using Primavera software (P3 version)/MS Project.
Ø Coordination with Civil, Mechanical, Electrical & Instrumentation department for engineering planning.
Ø Making the PO’s (Purchase Order) as required by the project specification using Oracle 11i version.
Ø Client & Sub Contractor’s billing.
Ø Issuing LOI and Work order for the project.
Mumbai Manmad Mangalya Pipe Line Project, (India): 13th Aug 2006 to 13th Jan 2007
332 km 16’’ Oil pipe line for Bharat Petroleum Corporation Ltd. was carried out by manual welding process. The line includes 7 SV stations and 2 IP stations the line was completed in all respects.
Responsibilities:
Ø Coordination with Civil, Mechanical, Electrical & Instrumentation department.
Ø Making and Verification of PO’s (Purchase Order) as required by the project specification using Oracle 11i version.
Ø Client & Sub Contractor’s billing.
Computer Skills:
Ø Ms Projects/Primavera P3 and P6 for scheduling and monitoring.
Ø Proficient in Planning Tools – ‘S’ Curve
Ø Working on Oracle 11i for making Purchase Orders.
Ø Ms-Windows-98, 2000 & XP professional Operating System.
Ø MS-Office (MS-Word, MS-Excel, MS-Power Point, MS-Access, MS-Outlook)
Ø Well Known With Internet, Lotus Notes, E-mail Browsing.
Training:
Ø T-BOSEIT (Tropical- Basic Offshore Safety Induction & Emergency Training) Training from Samson Tiara, Jakarta, Indonesia.
Personal Details:
Date of Birth : 15/08/1986
Marital Status : Married
Nationality : Indian
Languages known : Hindi, English.
Passport No. : G5089914
Present Address : Tower-15, Floor-15C, Apartment Taman Rasuna
Jakarta, Indonesia
Home Address : Near CEO office, GT Raod, Kurawali Mainpuri
Pin- 205265 (Uttar Pradesh) India.
+91-9756416097 (India)
Location: - JaKARTA, INDONESIA PRATYUSH k. cHATURVEDI