2012 to present I have worked with SICIM S.p.A, Kazakhstan Branch. as a Project Planner & scheduler
Project Reference
1. Water Injection System Upgread
2. 12" and 18" Trunkline Debottlennecting Project
3. Wellhead Flowline and Hook up
2011 to 2012 I had worked with CUEL Ltd. Bangkok, Thailan. as a Project Planner & scheduler
Project Reference
1. Chevron Project Phase 39, 41 adn 42. Total 15 platforms, 1 HUB platform and
associated 31 pipelines
2009 to 2011 I had worked with CUEL Ltd. Bangkok, Thailan as a Senior Cost Controller
Project Reference
1. Arthit 1C Project: 4 Wellhead Platforms, 4 Associated pipelines and 3 Browfields.
Owner: PTT Expolartion and Production Public Co., Ltd.
2. Essar D1 Project: 3 Jackets
Owner: Essar Offshor Subsea Limited
3. Suriya B Project: 1 Wellhead Platforms, 2 Brownfield.
Owner: Carigali Hess Operating Comapny Sdn Bhd.
4. BG-Hydra Project: 2 Wellhead Platforms
Owner: Swiber Offshor Construcjtion Pte., Ltd.
2003 to 2008 I had worked with Grand Builder Co., Ltd., Bangkok, Thailan as an asst. Estimator & Cost Controller
Project Reference
1. Superstore 14 Unit
2. Factory 3 Unit
3. Power Plan (55 MW) 1 Unit
4. Wast Water Treatment Plant 1 Unit
5. Biogas Plant 1 Unit
2000 to 2003 I had graduated in 2000 and start work as Teacher Assistant (Civil Engineering Program) at Sirindhorn International Institute
of Technology (SIIT), Thammasat University, Thailand.