START Date:
August, 2012 APLNG Coal Seam Gas Brisbane, Australia (AUG 2012 – Current) Lead Scheduler/Planner – Water Solutions Implementation Sub-Project
- Responsible for development of the level 4 schedule encompassing the various methodologies for coal seam gas water management.
- Directed the design and implementation of a fully integrated program of schedules encompassing the requirements of Water use strategies including; water treatment facility upgrade, pivot irrigation, water to landholder delivery, Re-Injection to aquifer, river discharge.
- Development of a modular and interchangeable progress measurement and schedule methodology capable of operating across all possible scenarios and scope changes.