Summary of Qualification: Project Control Staff in an Oil & Gas and Petrochemical Construction Industry. Develop and perform schedule update using Primavera Project Planner (P6/P3). Prepare planned S-curves, bar chart schedules. Set -up databases for calculating and tracking physical / earned progress in (Civil, Structural, Mechanical, Piping, E&I, etc.) and invoicing formats in compliance with client’s requirements and contract provision.
With more than 4 years experience in the field of drafting and modeling (primitive and surfacing) using UNIGRAPHICS (UG) NX3. Design proficiencies includes, 3D solid modeling, advance 3D surface design. Has strong desire to succeed, motivated, enthusiastic,quick to accept and adapt to new responsibilities.
Employment History: (From Present to Past)
Total years:
ØAbroad : < 3 years (Kingdom of Saudi Arabia) - (Oil & Gas and Petrochemical Construction)
0.80 year (Algeria, North Africa) - (Oil & Gas Construction)
ØLocal : < 4 years (Cebu, Philippines) - (Design, Engineering Support & Manufacturing)
Date of Employment | Job Title | Employer | Project | Country |
October 12, 2011 To August 10, 2012 | Project Scheduler |
Samsung Engineering Company Limited - Algeria |
Sonatrach - Skikda Refinery Rehabilitation and Adaptation Project
| Skikda, Algeria |
August 16, 2010 To August 16, 2011 | Planner / Cost Controller |
Bonatti SpA – KSA Branch |
Saudi Aramco - Upgrade Flare System in Uthmaniyah & Shedgum Gas Plant | Hofuf, Kingdom of Saudi Arabia |
|
|
|
|
|
July 10, 2009 To July 10, 2010 | Planner / Cost Controller |
Bonatti SpA – KSA Branch | Saudi Aramco – Upgrade / Replace Sales Gas Compressor Motor in UGP & SGP Gas Plant | Hofuf, Kingdom of Saudi Arabia |
February 23, 2008 To May 04, 2009
| Project Controls Engineer - IV | Mohammad Al Mojil Group (MMG) | Fluor Arabia Ltd. – Saudi Kayan Petrochemical Complex (Interconnecting Piperack) | Jubail Industrial City II, Kingdom of Saudi Arabia |
July 12, 2004 To February 19, 2008 | Associate Engineer | LEAR Corporation – Philippine Engineering Technological Center | Design Automotive Interiors, Seating System (UNIGRAPHICS Section – General Motors Customer Group) | MEPZ-2, Basak Lapu-lapu City, Cebu, Philippines |
January 12, 2004 To July 12, 2004 | Cadet Engineer | LEAR Corporation – Philippine Engineering Technological Center | Design Automotive Interiors, Seating System (UNIGRAPHICS Section – General Motors Customer Group) | MEPZ-2, Basak Lapu-lapu City, Cebu, Philippines |
April 14, 2003 To June 12, 2003 | On-The-Job Training (320 Hrs.) | Taiheiyo Cement Philippines, Inc. | Engineering and Mechanical Maintenance Division | South Poblacion, San Fernando Cebu, Philippines |
June 26, 2001 To March 05, 2002 | Groundman | Cebu Power Exponent Services Inc. | VECO Line Construction Maintenance Contractor | Pleasant Homes, Don Bosco Village, Labangon Cebu City, Philippines |
Position Key Functions:
Samsung Engineering Company Limited (SECL), Algeria
Skikda Refinery Rehabilitation and Adaptation Project
Ø Develop and update a resource loaded Primavera (P6/P3) Project Schedule of Samsung Engineering Algeria work scope utilizing an approved Work Breakdown Structure (WBS) from the project lead office in Seoul, Korea
Ø Prepare the weekly/ monthly target based on approved baseline and updated level 5 schedule.
Ø Performed earned value calculations for productivity and production trend analysis to verify production levels meet or exceed expectations and to ensure schedule is compliant with contractual milestone
Ø Perform continuous schedule updating & review to ensure milestone achievement and timely project completion. Run tabular & graphical reports. Fix & re-logic out-of sequence activities.
Ø Coordinate with discipline leads on progress updates & priorities.
Ø Monitor and analyze progress as a means to identify activities that are critical and in priority.
Ø Revise or re-baseline the Master Project Schedule showing corrected resources according to change order, budget shifts or deviation which includes changes in scope due to distinct method of execution or for any reasons.
Ø Identify the necessary work schedule to be completed by the Subcontractor.
Ø Prepare progress monitoring system including a progress tracking.
Ø Prepare and consolidate all Sub-contractor daily work report.
Ø Prepare ten (10) day rapport decadaire and monthly construction progress report.
Bonatti S.p.A. Saudi Arabia
Upgrade Flare System at Uthmaniyah and Shedgum Gas Plant
Upgrade/Replace Sales Gas Compressor Motor in Uthmaniyah and Shedgum Gas Plant
Ø Develop and update a resource loaded Primavera (P3) Project Schedule
Ø Prepare & update planned progress S- curve & quantity curve by overall project, area, system or discipline where required. Run tabular & graphical reports.
Ø Execute Project progress measurement in accordance with company procedures.
Ø Prepare the weekly target based on approved baseline and updated level 5 schedule.
Ø Perform continuous schedule updating & review to ensure milestone achievement and timely project completion. Fix & re-logic out-of sequence activities.
Ø Prepare & update planned progress S- curve by overall project, area, system or discipline where required.
Ø Update resource schedules, resource costing.
Ø Create and linked excel database as per contract for easy and real-time update of progress report. Maintain, organize and update datasheets of resources.
Ø Prepare & consolidate weekly progress status reports.
Ø Perform monthly progress invoice to proponent / client.
Ø Prepare Manpower/Man-hour & Saudization reports.
Ø Check sub-contractor progress / service invoices; evaluate unit rates used as per PO/Contract and understand all project costs including material, personnel, and equipment cost.
Ø Participate in project review meetings & constant communication with the client (Saudi Aramco).
Ø Preparation of reports as required by PMT’s, or project controls-related reports as instructed or required by client.
Mohammad Al-Mojil Group (MMG)
SAUDI KAYANPetrochemical Complex K022- FLUOR Arabia Limited
Ø Produce and maintain project plans, including S-curves, histograms, etc.
Ø Performs detailed planning/scheduling activities for compliance to contract requirements and internal execution requirements
Ø Perform continuous schedule updating & review to ensure milestone achievement and timely project completion. Fix & re-logic out-of sequence activities.
Ø Investigate areas where project progress deviate from the approved master schedule.
Ø Consolidate weekly overall progress computations for Site Management report
Ø Update resource schedules, resource costing.
Ø Perform periodic reconciliation of IFC quantities with Engineering.
Ø Track; verify work quantity accomplishment for mechanical piping, insulation and painting. Generate and update quantity database. Linked excel database for easy and real-time update of progress report.
Ø Mark-up completed works in approved for construction drawings & maintain organize filing system.
Ø Prepare & consolidate weekly pre-fabrication piping painting reports.
Ø Prepare weekly overall progress computation for Mechanical Piping, Structural Erection, Civil/Concrete, and Electrical works.
Ø Manpower & Equipment Schedule (Projection & Histogram).
Ø Preparation of reports as required by Project Controls Procedure, or project controls-related reports as instructed or required by client, PMT’s
Lear Corporation (Philippine Engineering and Technology Center)
Seating and Interior Systems Department - (UG) General Motors Customer Group
Ø Design and create seating’s and interiors of General Motors through UNIGRAPHICS NX3 (Advance Modeling and Surfacing Application)
Ø Develop specifications and procedures.
Ø Communicate issues and concerns to internal/external customers and suppliers.
Ø Study/research and benchmark best practices towards product improvement.
Ø Make proposals to improve processes and operations.
Ø Supports the implementation and maintenance of quality management system and ensures customer satisfaction and continual improvement through active participation in Quality System (QS) and Six Sigma activities.
Ø Makes 11 x 17 drawing formats for components/assemblies
Ø Performs light modeling jobs and designs on different Lear GM programs using UNIGRAPHICS software
Ø Design, detail changes and study which includes updating A and B side surface of Seat Cushion and Back Foam with the hybrid assembly structures
Taiheiyo Cement Philippines, Inc.
Engineering and Mechanical Maintenance Division
Ø Assist mechanic in preventive and corrective maintenance, repair and inspection. Removal and replacement (packing seal, oil and mechanical seal for accessory gear box-transmission / motor reducers, oil cycle pumps, water cooler pumps, ram cylinders (ball mill) and support bearings and rollers)
Ø Conduct functional check
Ø Drafting pulled-out parts for the machinist using Auto-Cad 2003