John Paul Constriction, Assistant Site Engineer – Webworks office development – Albert Quay, Cork City, Ireland (April 2005 – August 2005):
This project was a €15m new build project, which was a concrete cast-in situ office development with basement car-park. Acted as the assistant site engineer, undertaking duties similar to the Construction Management duties listed under the Chiswell St. project. Main duties also included the monitoring of water table level (piezometer equipment – adjacent to the river Lee), monitoring ground movement using the relevant site instruments (digital level, laser level, dumpy level, EDM, inclinometer) and providing points and levels of the structure (piling, pile caps, columns, flat slabs, etc.) for management of the pre and post pour quality checks. Also assisted in the document control management for the project.