Worked on the Construction of Intel Fab 10 for Intel from December 1994 to December 1995. Responsible for set up of construction schedules for E&I Installation for Intel's new Fabrication Plant. Work on schedules was developed in Primavera P3 Version 1.0 (with a dongle - those were the days!) and progress measurement was performed in excel as was earned value analysis.