November, 2010 Senior Planner on the Startford Peaker Power Station.
Install and Commission 2 x GE LMS100 Gas Turbines plus BOP.
Senior Planner on the Startford Peaker Power Station.
Install and Commission 2 x GE LMS100 Gas Turbines plus BOP.