START Date:
September, 2005
END Date:
September, 2004 - Execution of all the concrete elements as a contractor & Supervision on the Finishes Works
- Prepared the needed modifications of the drawings.
- Value Engineering to evaluate all alternatives to choose the best, most economic & feasible.
- Prepared reports for the Project Manager about any disadvantages which may cause the obstruction of achieving the plan.