START Date:
March, 1999 Cost controls on major projects, planning, scheduling, piping design and fabrication.
Cost controls on major projects, planning, scheduling, piping design and fabrication.
Links:
[1] http://www.planningplanet.com/category/skills-expertise/planning
[2] http://www.planningplanet.com/taxonomy/term/12922
[3] http://www.planningplanet.com/category/industry/oil-gas-power
[4] http://www.planningplanet.com/category/project/refinery-shutdown
[5] http://www.planningplanet.com/category/job-role/senior-planner-co-ordinator
[6] http://www.planningplanet.com/category/region/north-america-na/canada-naca