Experience | ZAZCO July 2010 to till date Senior Planning Engineer (Red Sea Palace – Jeddah – KSA / SR 130 millions) G-LINX Complete Solutions Feb 2007 to Mar 2010 Planning Engineer - Prepare and monitor Project Time Schedules using Primavera P6.
- Develop Work breakdown Structure (WBS)and Activity codes
- Develop Resource dictionaries, Calendars and assign to activities.
- Analyze critical path and prepare PERTlayouts
- Prepare S-Curves and Histograms for manpower and other resources and costs.
- Prepare and analyze cash flows
- Prepare various types of Graphical and Tabular Reports from P6 and P3
- Prepare Weekly and Monthly Progress Reports
- Prepare resource reports, cost reports for senior management
- Prepare Weekly and Monthly Look Ahead schedules
- Integrate sub-contractor schedules into the project schedule for proper management of project
- Resource and cost loading in the Project Schedule
- Generate Earned Value Reports
- Providing analysis and recommendations as corrective measures
- Monitoring & Tracking project progress against target schedule
- Schedule and monitor procurement activities to ensure timely arrival of materials and track variance
- Measuring performance and suggesting corrective actions
- Planned v/s actual schedules and cash flows
- Monitoring and Reporting over budget to senior management
- Establishing organization charts, procedures, data collection, and document flow plan
- Manpower planning in coordination with the site team
- Develop Enterprise Project Structure (EPS)and Organization Breakdown Structure (OBS)
- Working with advanced P6 functions like Resource leveling, Global Change, Resource Curves, Top down Estimation, Work products and Documents, Cost Accounts and Budgets
|
| NACE Solutions (P) Ltd. (on Project Basis) July 2008 to Mar 2009 Area Manager Projects Completed : - As an Area Manager, I was involved in Planning & Execution. Responsible for creating WBS,
- Activity sequencing, creating communication management plan, and planning procurements.
|
Experience (India) | S-LINE DEVELOPERS Aug 2006 to Feb 2007 Project Co-ordinator Residential Farm House, Villas & Commercial - India Manages projects and coordinates with the project engineer for the overall planning (work program, work schedule, material delivery schedule etc.) of the project activities; defines the scope and implements project plans in accordance with the client’s needs during project start-up, execution and completion stage. Sky- Hi Constructions (Highway/Roads Development Contractors) Sep1990 to Jan 1992 Supervisor Coordinate all program phases including planning, design, construction and close out. Actively engage the Construction Managers to ensure contracts are proceeding on time, within scope, and on budget. Assist Construction Manager in resolving contract issues and recommend remedial measures to minimize associated delays |
Certifications | PMP (Project Management Professional) - CCNP in 2006 (One Paper)
- CCNA (Cisco Certified Network Associate) in 2002
- Microsoft Certified Professional (MCP)
- Diploma in Hardware & Networking form Soft Traks Computers in 1998
- Advance Training in Customer Service Management.
|
Computer Skills: | - Primavera Project Management P6
- MS Projects
- MS Excel
- MS Word
- MS Power Point
|
Languages | English (Read , Write , Speak) Arabic (Read , Speak) Urdu (Mother Tongue) |
Education | PMP ( From PMI, USA) MBA (ICFAI) B.Com (Osmania University) |
Personal | - Indian National
- Muslim
- Married
|
Iqama Status | Transferable |
Reference | Available on request |