SKILLS:
Planning , Design ,commission , percommission ,mechanical completion ,executing Fabrication , Erection PIPING & EQUIPMENT in Unites OIL ,GAS ,MECHANICAL SYSTEMS
PETROCHEMICAL & POWER PLAnt
Fabrication , Erection , Commission , production & transmission and drilling platform
CUMPUTER SKILLS:
MICROSOFT OFFICE : in with 5 years experience
PDMS :in with 2 years experience
AUTO CAD :in with 2 years experience
HYSYS :in with 1 years experience
TOTAL YEARS EXPERIENCE: 13 years 6 month
HEAD DESIGN ,SHARGAN CONSULTING & ENGINEERING CO.,POUYESH PETROCHIMICAL CO. in ARAK PETROCHIMICAL CO. IRAN of 3/1/2007 till 8/1/2010
This company is supplier engineering &material service and too executes 3 pilot plant hydrazine hydrat (HH) hydrogen peroxide(H2O2) feryon(FA134) IN PUYESH petrochemical co. in ARAK
I manged a technical team for modified and new design in 3 plant 3 years.
MAIN RESPONSIBILITIES
-checking all technical document
-dissolve problems technical
-design a few equipment
-providing all executes &technical procedure and qc plan qc forms
Providing progress report for owner site manger
MY MAIN ACHIEVEMENTS
-complete design recover reactor HH
-complete dissolve problems technical main reactor H2O2
-redesign all piping 3 plant in 6 month without document only according site asbuilt
-design utility system (steam air water)
-redesign & changing HVAC system
HEAD TECHNICAL OFFICE , SHARGAN CONSULTING & ENGINEERING CO. BANDAR EMAM PETROCHIMICAL CO. MAHSHAHAR IRAN of 2/10/2005 till 2/15/2007
This company is supplier engineering service in 2 plant C2/C3 recovery & expansion olefin in BANDAR EMAM petrochemical co.
I manged a technical team for modified and new design in 2 plant 2 years.
MAIN RESPONSIBILITIES
-checking all technical document
-dissolve problems technical
-answering to all NCR & TQR issued of subcontractor
-providing all executes &technical procedure and qc plan qc forms
Providing progress report for owner site manger
MY MAIN ACHIEVEMENTS
-completion project 5 month fronter of project program
-completion project without accident to my procurement
-redesign flare system and connect c2/c3 flare with olefin flare
-complete design unit 91 in c2/c3 recovery
HEAD SITE ENGINEERING ,SAZEH CONSULTING & ENGINEERING CO. JAM PETROCHIMICAL CO. , ASSALUYE IRAN of 2/1/2004 till 2/1/2005
This company is supplier engineering &material service in HDPE plant in JAM petrochemical co. in ASSALUYE, I manged a technical team for modified and dissolve technical problems for 1 years.
MAIN RESPONSIBILITIES
-checking all technical document
-dissolve problems technical
-answering to all NCR & TQR issued of subcontractor
-providing all executes &technical procedure and qc plan qc forms
-Providing progress report for owner site manger
-consulting to erection & fabrication piping and equipment
MY MAIN ACHIEVEMENTS
-Designing cold flare
-decrease expenses in erection equipment till 25%
-Modified equipment damages in site
-Completion project according to project program
HEAD MECHANICAL ,MOSHANIR CONSULTING & ENGINEERING CO.IN ABADAN GAS POWER PLANT IN, IRAN of 6/1/2002 till 1/15/2004
This company is supplier engineering service in ABADAN gas power plant I manged piping & mechanical for 22 month
MAIN RESPONSIBILITIES
-checking all technical document piping & mechanical section
-dissolve problems technical piping & mechanical section
-answering to all NCR & TQR issued of subcontractor piping & mechanical section
-providing all executes &technical procedure and qc plan qc forms piping & mechanical section
Providing progress report for owner site manger piping & mechanical section
MY MAIN ACHIEVEMENTS
-completion project 4 month fronter of project program
-completion project without accident to my procurement
-repair jacking pumps without need to suppler to according ASME
certification & award of - GENERAL ELECTIC (GE) suppler unit to reason repair jacking pumps
HEAD TECHNICAL OFFICE , RADIRA CO. sub HYUNDI-TOTAL , 2&3 PHASE GAS REFINERY SOUTH PARS of 5/1/2001 till 5/15/2002
This company is execute piping and erection equipment in phase 2 & 3 gas refinery in south pars( sub HYUNDAI-TOTAL) in ASSALUYE IRAN, I manged technical office for 20 month in project.
MAIN RESPONSIBILITIES
-checking all technical document
-dissolve problems technical
-issue all NCR & TQR to main contractor
-Providing progress report for owner site manger
MY MAIN ACHIEVEMENTS
-completion project 2 month fronter of project program
-completion project without accident to my procurement
-certification & safety award of owner (HYUNDAI-TOTAL)
HEAD QC. MASHIN SAZI ARAK CO., BANDAR EMAM PETROCHIMICAL CO. MAHSHAHR IRAN of 1/24/2000 till 4/20/2001
This company is execute fabrication and erection store tanks in Bandar emem petrochemical co. in mahshahr iran , I manged QC team for 1 years
MAIN RESPONSIBILITIES
-Inspection and checking all works in fabrication(cutting fit up welding) erection
-welding inspection
-provide WPS & PQR test welder and issue certification for welder
TECHINCAL EXPORT , CONSULTING & ENGINEERING ITOK CO., ALMINA JAJARM CO. , JAJARM IRAN , of 5/15/1998 till 1/1/2000
This company is supplier engineering in productive complex alominiom in JAJARM – KHORASAN IRAN , I was busy work in fabrication and erection piping and HVAC with position haed piping workshop
TECHINCAL EXPORT , CONSULTING & ENGINEERING OIEC CO. , BANDAR ABBAS REFINERY , BANDAR ABBAS IRAN of 9/1/1996 till 4/1/1998
This company is supplier engineering &material service and execute piping and erection equipment in 001 unit oil refinery Bandar abbas