CPM – Based Pre-Trader & Post Tender Planning Scheduling, Monitoring, Reporting including following
● Specialized Works e.g. Sheet Pilling, Drilling, Piling , Cofferdam, De-Watering & Shoring etc.
● Slip Forming for Silos
● Construction Methodology, Proposal & write-ups
● Site Mobilization Plan & Site Facilities Plan
● Pre-Tender Site Survey & Report
● False Walk & Formwork Designing & Fabrication
● Owning & operation Cost of Plant & Equipment including Earth-Moving Plants
● Resource Allocation & Plant Deployment including the optimum utilization