Position | Deputy Project Manager/Senior Project Controls & Planning Manager |
Project | Burj DAMAN at the Dubai International Financial Centre (DIFC)
Description: 60 story mixed use towers incorporating 5 star hotel, commercial/office, residential, branded apartments and penthouses, recreational/community floors, retail space, conventional/automated car park and a providing a total area of some 1.6 million square feet Gross Floor Area (GFA 148,000 square meters) of accommodation; and a total Built-up Area of 3.2 million square feet (BUA 296,000 square meters).
|
Client | DAMAN REAL ESTATE CAPITAL PARTNERS LTD. |
Contract Value | AED 1.5 Billion (US$ 407 Million) |
Project | The Langham, Palm Jumeirah – Five Stars Hotel
Description: The project involves construction of a 5 star hotel comprising a basement level, a ground floor and 7 additional floors offering 323 rooms equipped with the latest amenities, all with a sea view and direct access to a private beach Located on the Crescent of The Palm Jumeirah. The hotel consists of two wings inter-connected with Sky Bridge and serviced with a Robotic Parking. The external works include Landscape, Water Feature, Swimming Pools, Kids Pool, Seafood Restaurant, Ramp to Main Entrance at third level and Boundary Walls.
|
Client | DAS REAL ESTATE Co. LLC. |
Contract Value | AED 386 Million (US$ 100 Million) |
Duties | × Develop, monitor and update Project Master Schedule × Develop and maintain Project Specific Programmes, Work Plans, Procedures and Methodologies. × Develop and maintain Project WBS × Develop and maintain Project Management Plan (PMP) including Communications Procedure & Change Control Procedures × Develop and maintain Project WBS × Value & Risk Analysis/Management × Prepare delay analysis reports for all EOT claims × Manage packages of employer direct contractors × Prepare Project Controls guidelines for procurement of consultants and contractors × Prepare and submit Monthly Reports to the Employer × Develop and maintain project information system including information accumulating and reports × Prepare variance reports in reference to time and cost × Review the Consultants/Sub-Consultants design Schedules/Reports × Review the Main Contractor/Sub-contractors Schedules/Reports × Preparation/Evaluation of Cost & Time impacts
|