January 2012 – October 2012
Position : Sr. Planning Engineer
Project : RUWAIS SULPHUR HANDLING TERMINAL 2
Ruwais, Abu Dhabi, UAE
Client : Al Jaber Energy System
Project Description: 2 Identical Space Frame Building with Rail Car Unloading Facilities to be used by GASCO to convert Sulphur chemical for agriculture compounds.
Project Cost : 70,000,000.00AED
September 2011 – October 2012
Position : Projects Control Engineer
Project : BOROUGE 3 – PO & LDPE PRE-ENGINEERED BUILDINGS
Ruwais, Abu Dhabi, UAE
Client : Tecnimont-Samsung Joint Venture
Project Description: Fifteen Pre-engineered Buildings for Polyolefins Units and Five Pre-engineered Buildings for LDPE Units to be used by Borouge.
Project Cost : $10,000,000.00
Duties
· Developing the most suitable sequence of operations for construction projects in addition to specifying the timing of the contract.
· Assign project duration & resources, and prepare Target schedule in Primavera as per Client’s project requirement.
· Planning and overseeing the entire program of work and anticipate contract's demands in terms of labor, materials, equipment and technical requirements
· Monitoring and keeping track of work progress throughout the construction process and comparing this with the projected schedule of work activities.
· Analyzing and studying current project status and provide necessary corrective recommendations and actions to ensure that the project is on track.
· Conducting site visits on regular basis and collecting necessary data as required studying project progress and workingschedule completion.
· Interfacing with the Project & the Control Managers in preparation of project budgets by anticipating required resources and technical requirements.
· Discussing quality & systematic plan with Project Manager & Construction Manager for proper execution & sequencing of activities to achieve smooth progress.
· Monitoring/Evaluating actual site performance and provide accurate & timely report (including weight charts) to the client in weekly/monthly basis as required.
· Checking and reviewing Critical paths, Slippages or variances alarming for delays and discuss immediate action / recovery plan to Project managers and client for a solution.
· Monitor/Review milestone schedule, mobilization plan and material procurement schedule.
· Reviewing construction schedule organized by Discipline wise activities & check suitability of resources to optimize performance in executing the tasks.
· Performing other duties related to the job as assigned by the Planning Department Manager.
November 2008 – September 2011
Position : Planning & Cost Control Engineer
Duties :
· Prepares tender, manpower & equipment schedule for bidded projects.
· Enhances proper planning and project implementation in all phases of construction using Primavera and Amanatech.
· Assistance in preparation of baseline schedule for newly acquired projects with resources uploaded.
· Prepares weekly progress report for all projects with analysis against budget and actual expenditures for the cost to complete.
· Prepares monthly corporate report for the forecast of manpower and monthly invoicing plan for each ongoing project.