START Date:
December, 1996
END Date:
February, 1999 - Coordinated timekeeping system and Project Control Monitoring of projects.
- Maintain project control database system developed using DBASE IV and Lotus 123 for all existing projects.
- Prepare Project Schedules and Manpower Loading
- Prepares weekly and cumulative man-hour expenditures for each work package on each project: Budget manpower, and other cost figures for each project, etc.
- Maintain project control database system developed using DBASE IV and Lotus 123 for all existing projects.
- Prepare Project Schedules and Manpower Loading
- Prepares weekly and cumulative man-hour expenditures for each work package on each project: Budget manpower, and other cost figures for each project, etc.