Senior Planning Engineer at First Engineering (Now part of babcock) [ Edit ]
Civil Engineering industry
January 2000 – December 2000 (1 year)
While part of Morrison Construction was seconded to First Engineering to assist with some high level and detail planning in Primavera P3 in the rail industry (signalling) for 11 months, recalled end April 2001, working with estimator, project managers and designers to ensure an overall programme that was achievable. Spent some time changing 5 project programmes written by separate planners into a format that the Glasgow head office format used.