Managed Motorway Paving works (Sub-base, Asphalt, and Drainage Channels) with 120 personnel (Foreman, Labor, Operators and Truck Drivers) and 50 pieces of equipment (Asphalt Pavers, Concrete Pavers, Rollers, Graders, Trucks and Tractors) on site and made sure that the scope of work was executed on time and within the budget. Worked closely with support departments such as Quality Control, Survey, Design, Equipment & Quarry/Plant Department to get the work completed on schedule.