Hi all,
Has anybody used, or can recommend, any plug-ins for MS Project that perform schedule analysis similar to DCMAs 14 point tripwire analysis?
I know I can go through my schedules and perform the analysis manually, but I will be getting a lot of subcontractor schedules to integrate in the coming weeks, and it would be good to get a first pass done on each schedule, before I have to start drilling down into the detail.
Regards,
Darren