Hi All,
Has any worked in an industrial construction poject where they have hoarded an entire structures i.e. a bigger one such as Reactor/Regenerator Structure so that during the winter months the piping work can be go uninterrupted.
If yes then please explain how it went and give me a rough idea to estimate manhours required for hoarding bigger structures on the basis of per cubic meter. Thanks.
Rashid
Has any worked in an industrial construction poject where they have hoarded an entire structures i.e. a bigger one such as Reactor/Regenerator Structure so that during the winter months the piping work can be go uninterrupted.
If yes then please explain how it went and give me a rough idea to estimate manhours required for hoarding bigger structures on the basis of per cubic meter. Thanks.
Rashid