I want to create an Activity Network Schedule with a TimeScale on top and with the Nodes distributed along the length of the timescale as per their start dates.
Is this posssible in Primavera-P6.1 or MS Project? If not possible is there any other software with which this is possible.
In earlier Primavera versions, I understand there was a provision for a layout called Pure Diagrams . This option is no longer available I presume.
Would appreciate help. If there is any other software available, kindly let me know where I can get them?
Thanks.
Govinda