As a contractor am I entitled to change the links/logic to show the program a being in line with planned when i submit my prediodic progress reports. Can these changes be considered as updating/ statusing the program.
More elaborately. My contract pgm is SR01 and in my monthly update for the same program i.e MU01, can i change the links (to bring back the delay of about 15days that my contract program is showing) without getting apporval from my engineer and substantiate this as also being a type of if i am questioned at a later date?
More elaborately. My contract pgm is SR01 and in my monthly update for the same program i.e MU01, can i change the links (to bring back the delay of about 15days that my contract program is showing) without getting apporval from my engineer and substantiate this as also being a type of if i am questioned at a later date?