Hi Dear Planners,
In p3e, after exporting schedule in excel format. I am getting date format with time, 8/25/2008 4:00:00 PM. How can I get rid from time and hiphen. I need to make changes in dates. Excel cant read this date format due to time and hyphen (‘)as a date.
Thanks
In p3e, after exporting schedule in excel format. I am getting date format with time, 8/25/2008 4:00:00 PM. How can I get rid from time and hiphen. I need to make changes in dates. Excel cant read this date format due to time and hyphen (‘)as a date.
Thanks