Hi Planners,
I just want to clear my confusions for resource units for labour and non labour.
Labor and non labor. I have a schedule with activities for example 1) Install piping, 2) Electrical , 3) shop fabrication dia inches etc.
I have assigned resouce pipefitter for first two activities & Labour as a unit and shop fabrication for third activity non-labor as a unit.
I dont know their way of calculation. I need to keep saperate resources units to activity duration and % complete.
whats the procedure for assigning proper units I need laours in hours and non-labours in inches. How many units I would consider maximum.
second: How can I level resources if we need not more then 5000hurs/week.
Thanks
Minhas
I just want to clear my confusions for resource units for labour and non labour.
Labor and non labor. I have a schedule with activities for example 1) Install piping, 2) Electrical , 3) shop fabrication dia inches etc.
I have assigned resouce pipefitter for first two activities & Labour as a unit and shop fabrication for third activity non-labor as a unit.
I dont know their way of calculation. I need to keep saperate resources units to activity duration and % complete.
whats the procedure for assigning proper units I need laours in hours and non-labours in inches. How many units I would consider maximum.
second: How can I level resources if we need not more then 5000hurs/week.
Thanks
Minhas