1) A resource leveling algorithm. (I know that it has one, Id just like one that I can explain when I look at the results)
2) Not having to reenter every single duration if my calendar changes.
3) Being able to assign resource levels by time of day (Im currently scheduling a turnaround with multiple shifts and Project is a nightmare to work with)
Anyone else?
Larry
2) Not having to reenter every single duration if my calendar changes.
3) Being able to assign resource levels by time of day (Im currently scheduling a turnaround with multiple shifts and Project is a nightmare to work with)
Anyone else?
Larry