Dear All,
I am encountering a problem in P3 3.1.
The cost spreading of an activity in graphic report is linear, i.e. cost spreaded equally on activity duration, while in tabular report it is loaded on the last day of that activity.
Can anybody help?
It should be mentioned that the cost is assigned directly and not through price per unit of the resource.
Joe