Planning Engineer, Reliance Engineering Associates Pvt. Ltd., QYI Crude, VMP FCC, JERP Crude, Gas Cracker SD, FCC SD
Career History
Reliance Engineering Associates (P) Ltd.
Manager (Since May 2005)
Projects Handled
From Jul 2010 – till date
Planning for FCC SD jobs.
From Apr 2010 – Jun 2010
Planning for Gas Cracker SD jobs.
From Jan 2009 – Mar 2010
Planning for post start-up construction jobs in JERP Crude.
From Jan 2006 – Dec 2008
Planning for grass root JERP Crude unit having 74,00,000 lakhs construction Mhrs.
From Jan 2004 – Dec 2005
Planning for Rx & Rg SD jobs.
Planning for Revamp Project of FCC unit having 21,00,000 lakhs pre shut down construction Mhrs.
From Dec 2002 – Dec 2003
Planning for Crude unit SD piping jobs.
Handled Scheduling, Monitoring and Reporting for Revamp project of Crude Unit having
6,00,000 lakhs pre shut down construction Mhrs.
From Oct 2002 – Nov 2002
Handled Scheduling, Monitoring & Reporting for SD jobs for VGO Unit.
Area of Responsibility
- Preparation of L3 construction schedule for green field as well as Pre S/D and S/D projects.
- Preparation of L4 construction schedule.
- Updating and tracking L3 & L4 schedule.
- Keeping track of first 5 critical paths.
- Preparation of variance report and catch plans.
- Monitoring and Control of construction activities.
- Preparation and updation of construction S-Curve.
- Preparation of weekly construction progress report for top management.
- Preparation of daily progress report for area manager.
- Finalization of Contractors’ monthly plan and follow-up.
- Implementation of incentive schemes as decided management.
- Preparation of 90 days lookahead schedule.
- Designing & Maintaining of databases for various construction disciplines.
- Coordination with design and project department.
- Follow up with structural & pipe fabrication shops.
- Follow up with material coordinators.
- Preparation of construction closeout report.