RSAL Senior Planner
START Date:
November, 2005
END Date:
May, 2006 •Analyze Primavera Level 4 overall schedule for look aheads.
•Coordinating with on-stream and downstream project personnel for the flow of work.
•Activity weighting analysis for earned value target for “S” curve.
•Analyze the Base line and Current Level 4 overall schedule to minimize slippages.
•Daily and weekly Progress reporting.
•Coordinating with on-stream and downstream project personnel for the flow of work.
•Activity weighting analysis for earned value target for “S” curve.
•Analyze the Base line and Current Level 4 overall schedule to minimize slippages.
•Daily and weekly Progress reporting.