Petrojet (Egypt) Senior Planner
START Date:
April, 2002
END Date:
December, 2007 Projects:
•Damiatta LNG project (Client is SEGAS) (Egypt) (50 Million Euro)
•Arabian Gas pipeline (Client is Fajr Co.) ( Jordanian kingdom ) ( 393 km , 36” ) (99 million $).
•Extension of Arabian Gas pipeline (Client is Fajr Co.) ( Jordanian kingdom )( 143 km , 20” )(51 million $).
•Compressor Gas station (Client is Fajr Co.) ( Jordanian kingdom ) (13.3 million $).
•Shrarah – Mellita crude oil pipeline (Client is Agip Co.) ( Libya ) ( 725 km , 30” ) (90 million Euro).
•Skikda crude oil pipeline (Client is Sonatrach Co.) ( Algeria ) ( 648 km , 30” ) (106 million Euro).
•Nuayyim Gas pipeline (Client is Aramco Co.) ( Saudi Arabia ) ( 150 km , 16" ) (30 million $).
•5 Gas stations (Client is Apatchy & Khalda Co.) ( Egypt ) (100 million $).
•11 tanks (25000 bbl capacity for each) (Client is Apatchy & Khalda Co.) ( Egypt ) (8.2 million $).
•Qasr–Salam Gas pipeline & the associated facility (Client is Apatchy & Khalda Co.) (Egypt) (34 km , 24") ( 90.5 million $ )
•Salam Gas Train No. 3 & 4 (Client is Petrofac Co.) ( Egypt ) (52.8 million $).
•Saint Kathreen pipeline ( Client is SSRDP ) ( Egypt ) ( 33.4 km , 10" + 57.8 km , 12" )( 11 million Euro ) .
•Cold crystallization plant (Client is The Arab Potash Co.) ( Jordanian kingdom ) (84 million $).
Project Description:
* For pipelines: Engineering design, procurement and Execution of pipelines (surveying works, R.O.W, Stringing, Welding, N.D.T, Coating, Excavation, Laying, Backfilling, Cathodic Protection, Electrical and Instrumentation works).
* For stations: Engineering design, procurement and Execution of civil work (pipe rack foundations, equipment foundation and industrial building), mechanical work (tanks erection, piping fabrication and erection, equipment erection and steel structure erection) and E&I works.
* For tanks: Engineering design, procurement and Execution of civil foundations, mechanical work (tanks erection, piping fabrication and erection) and E&I work.
Job Title:
•The first two years as planning engineer, the others as senior planning engineer (Civil, Mechanical and E&I).
Job Responsibilities:
•To review the project’s budget.
•To ensure that a detailed, fully integrated, resourced and properly logic linked construction schedule is produced for the Project. The planning staff working within the various sections of the works produces the individual sub-projects.
•To ensure that all schedules produced by the planning teams comply with the project planning procedure.
•To ensure that the project construction schedule is progressed accurately once per week, and to report the project status against the key milestone dates.
•Produce weekly KPI’s of construction performance for each materials and milestones of the works.
•To prepare a consolidated daily, weekly and monthly progress reports for CEO.
•Follow up the productivity for project and compare it with the total company productivity. Prepare the final productivity file to assist the company for future projects.
•Prepared the revised schedule loaded with all resources and revenues.
•To assist in the detailed construction planning of the works.
•Damiatta LNG project (Client is SEGAS) (Egypt) (50 Million Euro)
•Arabian Gas pipeline (Client is Fajr Co.) ( Jordanian kingdom ) ( 393 km , 36” ) (99 million $).
•Extension of Arabian Gas pipeline (Client is Fajr Co.) ( Jordanian kingdom )( 143 km , 20” )(51 million $).
•Compressor Gas station (Client is Fajr Co.) ( Jordanian kingdom ) (13.3 million $).
•Shrarah – Mellita crude oil pipeline (Client is Agip Co.) ( Libya ) ( 725 km , 30” ) (90 million Euro).
•Skikda crude oil pipeline (Client is Sonatrach Co.) ( Algeria ) ( 648 km , 30” ) (106 million Euro).
•Nuayyim Gas pipeline (Client is Aramco Co.) ( Saudi Arabia ) ( 150 km , 16" ) (30 million $).
•5 Gas stations (Client is Apatchy & Khalda Co.) ( Egypt ) (100 million $).
•11 tanks (25000 bbl capacity for each) (Client is Apatchy & Khalda Co.) ( Egypt ) (8.2 million $).
•Qasr–Salam Gas pipeline & the associated facility (Client is Apatchy & Khalda Co.) (Egypt) (34 km , 24") ( 90.5 million $ )
•Salam Gas Train No. 3 & 4 (Client is Petrofac Co.) ( Egypt ) (52.8 million $).
•Saint Kathreen pipeline ( Client is SSRDP ) ( Egypt ) ( 33.4 km , 10" + 57.8 km , 12" )( 11 million Euro ) .
•Cold crystallization plant (Client is The Arab Potash Co.) ( Jordanian kingdom ) (84 million $).
Project Description:
* For pipelines: Engineering design, procurement and Execution of pipelines (surveying works, R.O.W, Stringing, Welding, N.D.T, Coating, Excavation, Laying, Backfilling, Cathodic Protection, Electrical and Instrumentation works).
* For stations: Engineering design, procurement and Execution of civil work (pipe rack foundations, equipment foundation and industrial building), mechanical work (tanks erection, piping fabrication and erection, equipment erection and steel structure erection) and E&I works.
* For tanks: Engineering design, procurement and Execution of civil foundations, mechanical work (tanks erection, piping fabrication and erection) and E&I work.
Job Title:
•The first two years as planning engineer, the others as senior planning engineer (Civil, Mechanical and E&I).
Job Responsibilities:
•To review the project’s budget.
•To ensure that a detailed, fully integrated, resourced and properly logic linked construction schedule is produced for the Project. The planning staff working within the various sections of the works produces the individual sub-projects.
•To ensure that all schedules produced by the planning teams comply with the project planning procedure.
•To ensure that the project construction schedule is progressed accurately once per week, and to report the project status against the key milestone dates.
•Produce weekly KPI’s of construction performance for each materials and milestones of the works.
•To prepare a consolidated daily, weekly and monthly progress reports for CEO.
•Follow up the productivity for project and compare it with the total company productivity. Prepare the final productivity file to assist the company for future projects.
•Prepared the revised schedule loaded with all resources and revenues.
•To assist in the detailed construction planning of the works.