Petrobel Senior Planner
START Date:
January, 2009
END Date:
August, 2009 - Prepare the annual CAPEX budget for all the projects.
- Planning, scheduling, and control dedicated projects out of all projects.
- Propose and setup the project cost control system for the new projects and define the number of the cost breakdown elements needed to control the project cost.
- Officially inform the financial department to create and activate on SAP the proposed cost breakdown elements (CBS) to allocate in later stage the cost of the project material purchase orders and the invoices of the contractors.
- Create and manage the invoices follow up information system and teach and train the staff of invoicers and cost controllers to use it.
- Create and manage the projects follow up information system and teach and train the staff of projects controllers to use it.
- Add the ad-hoc reports into the information systems for the new requirements in addition to the periodical maintenance operations.
- Review and analyze the cost data submitted by the contractors in order to make the forecasts of the estimate at completion cost, that makes sure that the project cost is going as planned and indicated in the project budget.
- Allocate and approve the cost breakdown structure on the invoices of the contractors and create and release on SAP call offs and service tickets.
- Analyze SAP system for each of the dedicated projects in order to get accurately actual costs and asses the accruals.
- Update the cost management system for the dedicated projects and provide the projects managers with the cost variance if any.
- Update the projects schedules and control sheets for the dedicated projects including the contracts management, material procurement follow up and integrate SAP data and the invoices control information system.
- Establish the earned value management system and keep it updated by the end of each control period.
- Prepare the long term cost estimates (5 and 10 years).
- Prepare the official presentations in order to present the projects situations.
Im professionally doing / can do the following:
1- Projects Planning, Cost Engineering and Estimates:
- Formulating the project scope, interpreting into deduced WBS and relevant activities, allocating reasonable resources and outputting logically leveled (smoothed) histograms.
- Issuing technical cost and resources time-phased baseline master and detailed schedules.
- Generating annual CAPEX budgets (Fiscal and Calendar) by cost engineering modules and utilizing modeling and simulation techniques for long term estimates (5 & 10 years cost-phased plans) using computerized statistical models and probabilities distributions.
- Graphically presenting the Network Diagrams (AON & AOA), PERT, Gantt (Bar chart), curves (Banana, trend and S-curves).
- Preparing contingency plans and multi-scenario schedules.
2- Projects Scheduling, Cost Control and Forecasts:
- Tracking the activities physical progress and updating the projects schedules.
- Analyzing the Critical Path (CPM), schedule slippage and suggesting alternative solutions.
- Monitoring all offshore working vessels and updating the offshore integrated schedule.
- Controlling various types of costs (Direct, indirect, procurement, transport and G&A).
- Reviewing, breaking down, and allocating costs (CBS) of contracts and invoices.
- Controlling the contracts values (Awarded, consumed and residual), with respect to each contract scope in order to prevent facing any variation orders or extra costs.
- Creating and releasing SAP call offs and service tickets, gathering accurately actual and cumulative costs (Multi-currency invoices cost allocation & approval) & assessing accruals.
- Analyzing SAP entries, comparing costs (Budget and actual) and declaring cost variance.
- Computing Earned Value, schedule-cost forecasts and Estimated Final Costs (EFC).
- Supervising the projects control staff to feed and update periodically the computerized project control system for continuous and effective control.
3- Reporting (Arabic and English):
- Customizing Primavera, MS-Project, Excel, Access and SAP professional reports (Ad-hoc).
- Issuing timely, objectively and transparently various physical and cost progress reports on annual, monthly, weekly, daily and flash basis in addition to the close-out reports.
- Issuing convenient reports for management level, board meetings and external authorities.
- Submitting projects schedule/cost situations and proofing reasonable justifications for the Shareholders and internal/external auditors.
- Various presentations for various occasions (General assembly, Board meetings…etc.).
4- Computer Ready-made Applications (Professional Level):
- Primavera© Enterprise P3e/c - Primavera 5 & 6 (Im Primavera© Certified).
- SAP© (Basic and advanced modules like the project cost actual line items module…etc).
- SIGEP (Web-Based Projects Control Database).
- MS© Office (Project, Excel, Access, PowerPoint, Word & Outlook).
- The Electronic Archiving IBM© Content Manager.
5- Languages:
- Arabic (Mother Language)
- English and Italian (Speaking, writing and reading good command)
6- Computerized Projects Control Systems Design, Creation and Managing:
I designed, created, administrated and maintained a Multi-User Integrated Project Control System.
7- Various Types of Projects Contracts: EPC, Lump sum, Unit Rate, Reimbursable, BOT…etc.
- Planning, scheduling, and control dedicated projects out of all projects.
- Propose and setup the project cost control system for the new projects and define the number of the cost breakdown elements needed to control the project cost.
- Officially inform the financial department to create and activate on SAP the proposed cost breakdown elements (CBS) to allocate in later stage the cost of the project material purchase orders and the invoices of the contractors.
- Create and manage the invoices follow up information system and teach and train the staff of invoicers and cost controllers to use it.
- Create and manage the projects follow up information system and teach and train the staff of projects controllers to use it.
- Add the ad-hoc reports into the information systems for the new requirements in addition to the periodical maintenance operations.
- Review and analyze the cost data submitted by the contractors in order to make the forecasts of the estimate at completion cost, that makes sure that the project cost is going as planned and indicated in the project budget.
- Allocate and approve the cost breakdown structure on the invoices of the contractors and create and release on SAP call offs and service tickets.
- Analyze SAP system for each of the dedicated projects in order to get accurately actual costs and asses the accruals.
- Update the cost management system for the dedicated projects and provide the projects managers with the cost variance if any.
- Update the projects schedules and control sheets for the dedicated projects including the contracts management, material procurement follow up and integrate SAP data and the invoices control information system.
- Establish the earned value management system and keep it updated by the end of each control period.
- Prepare the long term cost estimates (5 and 10 years).
- Prepare the official presentations in order to present the projects situations.
Im professionally doing / can do the following:
1- Projects Planning, Cost Engineering and Estimates:
- Formulating the project scope, interpreting into deduced WBS and relevant activities, allocating reasonable resources and outputting logically leveled (smoothed) histograms.
- Issuing technical cost and resources time-phased baseline master and detailed schedules.
- Generating annual CAPEX budgets (Fiscal and Calendar) by cost engineering modules and utilizing modeling and simulation techniques for long term estimates (5 & 10 years cost-phased plans) using computerized statistical models and probabilities distributions.
- Graphically presenting the Network Diagrams (AON & AOA), PERT, Gantt (Bar chart), curves (Banana, trend and S-curves).
- Preparing contingency plans and multi-scenario schedules.
2- Projects Scheduling, Cost Control and Forecasts:
- Tracking the activities physical progress and updating the projects schedules.
- Analyzing the Critical Path (CPM), schedule slippage and suggesting alternative solutions.
- Monitoring all offshore working vessels and updating the offshore integrated schedule.
- Controlling various types of costs (Direct, indirect, procurement, transport and G&A).
- Reviewing, breaking down, and allocating costs (CBS) of contracts and invoices.
- Controlling the contracts values (Awarded, consumed and residual), with respect to each contract scope in order to prevent facing any variation orders or extra costs.
- Creating and releasing SAP call offs and service tickets, gathering accurately actual and cumulative costs (Multi-currency invoices cost allocation & approval) & assessing accruals.
- Analyzing SAP entries, comparing costs (Budget and actual) and declaring cost variance.
- Computing Earned Value, schedule-cost forecasts and Estimated Final Costs (EFC).
- Supervising the projects control staff to feed and update periodically the computerized project control system for continuous and effective control.
3- Reporting (Arabic and English):
- Customizing Primavera, MS-Project, Excel, Access and SAP professional reports (Ad-hoc).
- Issuing timely, objectively and transparently various physical and cost progress reports on annual, monthly, weekly, daily and flash basis in addition to the close-out reports.
- Issuing convenient reports for management level, board meetings and external authorities.
- Submitting projects schedule/cost situations and proofing reasonable justifications for the Shareholders and internal/external auditors.
- Various presentations for various occasions (General assembly, Board meetings…etc.).
4- Computer Ready-made Applications (Professional Level):
- Primavera© Enterprise P3e/c - Primavera 5 & 6 (Im Primavera© Certified).
- SAP© (Basic and advanced modules like the project cost actual line items module…etc).
- SIGEP (Web-Based Projects Control Database).
- MS© Office (Project, Excel, Access, PowerPoint, Word & Outlook).
- The Electronic Archiving IBM© Content Manager.
5- Languages:
- Arabic (Mother Language)
- English and Italian (Speaking, writing and reading good command)
6- Computerized Projects Control Systems Design, Creation and Managing:
I designed, created, administrated and maintained a Multi-User Integrated Project Control System.
7- Various Types of Projects Contracts: EPC, Lump sum, Unit Rate, Reimbursable, BOT…etc.
- Company:
- Industry:
- Region: