Amec International Chile Lead Planner
START Date:
May, 2003
END Date:
January, 2005 Company Mandator E.P.C.M. for the “Maria Elena Nitrate Plant” Soquimich. Planning and Control project in Primavera 3.1 for the Basic -detail engineering. In charge of Monthly report. Executive summary, progress curves, planning schedule and man-hours report. Checking program.-
E.P.C.M. the “Laguna Seca y Los Colorado’s coarse particle recovery” Planning and Control project in Primavera 3.1 for the Basic -detail engineering.
In charge of Monthly report. Executive summary, progress curves, planning schedule and man-hours report. Checking progress control sheet
E.P.C.M. the “Laguna Seca y Los Colorado’s coarse particle recovery” Planning and Control project in Primavera 3.1 for the Basic -detail engineering.
In charge of Monthly report. Executive summary, progress curves, planning schedule and man-hours report. Checking progress control sheet