TAV Construction Project Controls Manager

START Date: 
August, 2005
END Date: 
March, 2009
Project:      Sulafa Tower (295 m Height: 4B+G+76 Floors)
Client:          Mohammed Abdulla Mohammed Al Sayyah
Consultant:     AL ASRI
Contract Value: 356 Million AED
Scope:     Construction of 4 Basement Floors, 1 Ground Floor, 4 Podium Floors, 63 Typical Floors, 2 Service Floors, 3 Duplex Floors (Pent House) and 1 Health Club i.e. Residential Tower.
Responsibilities:     
•     Responsible for establishing Master Construction Schedule (Level 4) in Primavera 6.0.
•     Steering initiatives towards establishment of Project Budget & comparing it against tendered prices.
•     Capably synchronizing all the activities related to main Contract Administration.
•     Focusing on drafting subcontract agreements/conditions of sub-contract (general & particular) in line with FIDIC 1987 Red Book.
•     Successfully setting-up of Progress Monitoring System including implementation of Time Impact Analysis – window analysis technique.

Project:      Majestic Tower (205m Height: G+52 Floors)
Client:          Khamas Group (KG)
Consultant:     CAB Consult
Contract Value: 169 Million AED
Scope:     Ground Floor, 6 Parking Floors, Swimming Pool Floor, Office Floor, 44 Floors Residential Building.
Type A - 21 Floors, Type B – 6 Duplex Floors, Type C - 5 Floors and Type D – 3 Duplex
Floors (Pent House).
Helicopter Pad, Duplex Type Flats & Pent House.
Responsibilities     
•     Responsible for wide gamut of activities entailing planning & establishing Master Construction Schedule (Level 3) in Primavera 5.0/6.0 and confirming Project Budget & comparing it against tendered prices.
•     Meticulously fore fronting the establishment of Project Method Statement and ensuring timely release of construction drawings for Site Team/Subcontractors for proceeding work.
•     Competently analyzing contractual documents and overseeing the preparation of related document such as work program, progress reports, subcontractor progress payments, cost controlling, periodical activity reports, etc.
•     Skillfully preparing and initiating work program follow-ups and executing these works by being responsible to the Project Manager.
•     Actively involved in drafting subcontract agreements/conditions of sub-contract (general & particular) in line with FIDIC and establishing site safety rules & regulations.
•     Strategically selecting subcontractors and participating in price negotiation.
•     Proactively participating in Client’s technical coordination meeting, Subcontractor’s meeting, Internal Management meeting, etc.
•     Initiating development of revised program as and when required according to the data from site technical personnel.
•     Effectively evaluating production progress and its expenditures in parallel to the works concerning the project budget and conducting comparative study with accounting data and preparing the Budget.
•     Preparing subcontractor progress payments after controlling the current footages of the site technical personnel’s detections, and submitting them for approvals to the Project Manager.
•     Detecting deviations from cost and time and if any, reporting the same to the Project Manager and proposing possible measures.
•     Effectively coordinating with Project Manager, Consultant’s Resident Engineer, Client’s representative to run the project smoothly.