Principal Planning Engineer, Saipem, EPIC of Al Wasit Offshore Gas Development Program, Saudi Aramco- Saudi Arabia
EXPERIENCE IN PRESENT EMPLOYMENT
2007- Present
ENI - SAIPEM SpA -UAE
Principal planning Engineer for:
NationalSecurity Shield Sensor Tower Platforms (STPs) and Forward Mounted Base (FMB) AT Offshore QATAR
Responsible for Project Planning and Controlling, support to the Project Director for the co-ordination and development of an integrated project plan. The project scope was to provide a system for observation, detection, decision making and intervention action to warrant the security of all vital offshore assets by installing umbilical facilities, New Offshore Pipelines, new Sensor Tower Platforms (Seven STPs) and a Forward Mounted Base platform (FMB).
And also responsible to manage all Cost, Planning & Document Control Dept's. Preparing the Project control and maintain a high quality schedules (Primavera P6),preparing monthly progress and performance reports to clients. Develop and implemented procedures for Cost and performance Control and monitoring for compliance with the contract.
EPIC of Al Wasit Offshore Gas Development Program, Saudi Aramco- Saudi Arabia
Responsible for Project Control, Planning and Cost control for the EPIC contract of the offshore packages Wasit gas development, encompassing the offshore development of the Arabiyah and Hasbah fields, located in the Persian Gulf.
Also responsible to Develop, implement & control project procedures, schedules budgets, estimates, and scope change orders, with computerized systems (Primavera). Carry out risk analysis on both schedules and Budgets. Update schedules with physical progress and man-hour expenditure to show all trends, status, and forecast & prepare scenarios. Evaluate all bids and revised Control Budgets/Schedules submitted by contractors. Negotiate any claims or change orders. Prepare & present all reports to client
The complete development of the two fields encompasses the engineering, procurement, fabrication and installation of a total of 12 wellhead platforms, 2 tie-in platforms and 1 injection platform, besides to a 36 inches 260-kilometres-long export trunk line and approximately 200 kilometers of mono-ethylene glycol (MEG) pipelines, 200 kilometers of subsea electric and control cables and 40 kilometers of offshore flowlines. The scope of work also includes the shore approaches and about 120 kilometers of onshore pipelines.
EPCI, Hook-up and Commissioning of the offshore Platforms in Kazakhstan
Responsible for Project Planning and Controlling, support to the Project Director for the co-ordination and development of an integrated project plan. Reporting the progress, interface with client and Performance monitoring.
SAIPEM, in partnership with Aker Solutions, has been awarded by AGIP KCO the contract for activities for the Engineering, Procurement , construction, installation, hook-up and commissioning of the offshore Platforms as well as for the onshore completion and pre-fabrication in the Kuryk yard in Kazakhstan.
AquilaFloating Production Storage and Offloading (FPSO),Eni EPIC Project -
Responsible to plan, monitor, and control the execution of the project within the time and budgetary parameters, optimizing resource utilization, also to develop systems and procedures for project control functions. Responsible to prepare the detail progress measurement system for project progress S curves.
The contract, awarded by Eni, encompasses the conversion of a wholly owned oil tanker into a FPSO vessel with storage capacity of 700,000 barrels and a production capacity of 12,000 barrels of oil per day, for which Saipem provides the installation and the operation management.
FEED for Installation of 48” and 53”Gas Pipelines in Abu Dhabi- GASCO
Responsible for Project planning and controlling of engineering consultancy services for the preparation of Front End Engineering Design (FEED)
The project scope was engineering for removal of a 20” pipeline (20 km) and installation a 52” Sales Gas pipeline (107 km) and a 48” Sales Gas pipeline (15 km) with relevant launching and receiving stations comprehensive of Scraper traps, Gas Filters, Ultrasonic Metering and Pressure Reduction skids.
Tender and Bids
Proposal Principal Planning Engineer
Responsible for preparation of proposed time schedule and planning package including manpower histogram and manpower deployment together with the proposed S-curve, also coordinating between Engineering, Procurement and Construction team at the following Bids:
|
The tender was a EPCI Packages for the development of the southern part of Mafumeira field, located approximately 30 kilometers off the Angolan coast, including the engineering, procurement and pre-fabrication activities for subsequent offshore modification and tie-in activities on the existing Mafumeria Norte Platform and the future Mafumeria Sul platforms.
|
- FEED for Installation of 48” and 53”Gas Pipelines in Abu Dhabi- GASCO :
Engineering for removal of a 20” pipeline (20 km) and installation of a 52” Sales Gas pipeline (107 km) and of a 48” Sales Gas pipeline (15 km) with relevant launching and receiving stations comprehensive of Scraper traps, Gas Filters, Ultrasonic Metering and Pressure Reduction skids.
EPIC Proposal to Enhance the production in the LAM Field by setting up two Offshore Wellhead Platforms named “LAM-D” & “LAM-E” with Associated Pipelines. The Tender also covers the scope of extending Block 2 Platform (Riser Platform) and modification works on “LAM 21” (Existing Platform) to accommodate a pig launcher for the 10” line from LAM 21 to Block 2.
EPIC Proposal to install new SPM (Single Point Mooring) & pipeline system to handle both Crude oil & Fuel oil, capable of handling fully Laden VLCCs (Very Large Crude Carries) . The Tender also covers the scope of Constructing the new Crude Oil Storage Tanks. |
|
|
1999-2007
SAZEH Consultants Engineering and Construction Company, Tehran-Iran
Planning Manager in the Following Oil ,Gas and Petrochemical Projects:
South Pars Gas Field Development Phase 15& 16:
Planning and Cost - time controlling of the Basic Design and Detail Engineering for Gas Gathering and Gas Field Development of South Pars Phase 15 & 16. The project location is in Bandar Asaluyeh, South part of Iran (Bushehr Province) in South Pars Gas Field which is shared between Iran and Qatar.
And Also Preparing Project activity list, Time Schedule, Progress reports, system analysis and reporting project budget, time and resource plan versus Actual for this Project.
SHAZAND ARAK Refinery Expansion and Products Upgrading Project-
Responsible for Project planning, Time Scheduling and Cost Controlling of Engineering, Procurement and Construction of Refinery Expansion and Products Upgrading Project. The Project intends to implement an expansion revamp and products upgrading and also to investigate the impacts of this revamp and expansion on the overall operation of existing units and facilities of ARAK Refinery which is Located in Centre of Iran. And Also Preparing Project activity list, Time Schedule, Progress reports, system analysis and reporting project budget, time and resource plan versus Actual for this Project.
Senior Lead Planner in the following projects
Pars Petrochemical Complex Offsite Facilities
Responsible for Project planning and controlling , Preparing, Time Schedule, Progress reports, system analysis and reporting project budget of EP (engineering and Procurement) for the 9th Olefin Petrochemical Complex Offsite facilities, located at Bandar Asaluyeh, sea shore North of the Persian Gulf, in the Bushehr province of Iran, including planning, controlling and monitoring the performance of basic and detail design and engineering, procurement and supply of all equipments and materials for Offsite of the Complex. And Also quality control of all Document and Drawing issued for the project in accordance with the Quality management standards systems” ISO 9001-2000, TS-29001-2003, IS0 14001-2004”.
HDPE– Marun Project (Mahshahr)
Responsible for Project planning and controlling of EPC (Engineering and Procurement and Construction) for HDPE (High Density Polyethylene) production plant which is located in Marun- Mahshahr south of Iran. The HDPE Plant in designed to produce 300,000 TPA HDPE based on Basell Technology. The Plant consists of following units: - Powder Production Unit - Powder Work Up Unit - Pellet Homogenizing Unit - Auxiliary Production Unit - Tank Farm’s Unit - Palletizing Unit - Utilities Unit - Bagging Unit - Fire Fighting - Laboratories - Central Control room - Pipe racks And Also quality control of all Document and Drawing issued for the project in accordance with the Quality management standards systems” ISO 9001-2000, TS-29001-2003, IS0 14001”.
PTA-1 Project. (Iran- Mahshahr)
Responsible for Project planning, Time and Cost Controlling of EPC (Engineering and Procurement & Construction) for PTA (Pure Terephthalic Acid) production Plant .The PTA-1 Production Plant is designed to produce 350,000 PTA based on Inca Technology. The project comprises of the following units: - CTA Unit - PTA Unit - Compressed Air Unit - Feed Storage Unit - Product Storage Unit - Bagging & Product Ware House - Non Industrial Buildings - Offsite Common Pipe Way And Also Preparing project Work Breakdown Structure (WBS), Project activity list, Time Schedule, Progress reports, system analysis and reporting project budget, time and resource plan versus Actual for this Project.
C2 cracking & 9th Olefin Flare Lines
Responsible for Project planning and controlling of EPC( Engineering , Procurement & Construction) for two 68” and 72” flare pipeline From C2 cracking and 9th Olefin Petrochemical Plant toward Flare areas Located approximately 4 Km at North Side of plants.( Bandar Asaluyeh , South of Iran). Preparing Time Schedule, Progress reports, system analysis and reporting project budget, time and resource plan versus Actual.
POSFR
Preparing Time schedule and controlling the man hour and activities for preparation of the bid Document for EPC Tender of the POSFR proposal including more than 100 Nos. of wellheads facilities, Flow line and Transfer lines with different lengths and service conditions (Sweet/Sour) and fluid (Gas/Water)and,… Located in Aghajari, Iran.
Kharg NGL-EPC Proposal
Preparing Time schedule and controlling the man hour and activities for preparation of the bid Document for EPC Tender of NGL 2300 located in Kharg Island South of Iran. This Project included The NGL recovery facility and consisted of the simultaneous development of two separate gas treatment and NGL recovery plants sharing common utilities and liquid export systems from both onshore and offshore sources.
Project Planner ,Cost, Time ,Resource Controlling in the Following Complex Building Projects:
Reroute and Mechanical design for 56”Gas Pipeline in Assaluye .Responsible for Project planning and controlling for Detail Design and Construction of the 14 Km 56”Gas Pipeline South of Iran. Preparing Time Schedule, Progress reports, system analysis and reporting project budget, time and resource plan versus Actual this Project in all stages.
Sazeh Company Headquarter Multi story building, Tehran, Iran
Responsible for Project planning and Cost controlling for Engineering and Construction of Sazeh Headquarter Multi story building
Arvand Petrochemical Bandar Imam PVC plant Buildings:
including Site office, Laboratory, central control building, ware houses, chemical cold storage, cell work shop, Analyzer buildings, main electrical substation, electrical –filter building, electrical rectifier buildings, Mahshahr, Iran
Cost and Risk assessment and Preparing Document and implementing the plan of Health, Safety, environmental Objectives for the ongoing projects
Marun Petrochemical Complex-Offsite Facilities (Mahshahr)
Responsible for Preparing Document and implementing the plan of Health, Safety, environmental Objectives .And Also Risk management of EPC (Engineering and Procurement and Construction) Petrochemical Complex-Offsite Facilities which is located in Marun- Mahshahr south of Iran.
PTA-1 Project. (Bandar Imam, Iran- Mahshahr)
Cost control and Risk management in PTA-1(Pure Terephthalic Acid) production Plant .The PTA-1 Production Plant is designed to produce 350,000 PTA based on Inca Technology. The project comprises of the following units: - CTA Unit - PTA Unit - Compressed Air Unit - Feed Storage Unit - Product Storage Unit - Bagging & Product Ware House - Non Industrial Buildings - Offsite Common Pipe Way, And Responsible for Preparation of the invoices, controlling the subcontractor’s payment in PTA-1 project which is located in Mahshahr –South of Iran. Including All activities related to Control of steel structure delivery from vendor’s shop to site.
1998-2000
Oxygen Mahabad Company. Tehran-Iran
Project controlling, Preparing of plan and Time schedule for Maintenance of Abguineh Qazvin Company& Sillice Semnan company.