Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Piping Engineer - Engineering/Fabrication, Grinaker-LTA M&E, Construction of offshore & subsea facilites

START Date: 
September, 2004
END Date: 
December, 2007

•     Review client AFC drawings, procedure and standards.
•     Prepare project specification, standard and methodology.
•     Prepare, generate and review material quantity.
•     Prepare and review piping test package.
•     Review and prepare drawing for CAD detailing.
•     Attend project meeting, client and internal, for project status report.
•     Provide engineering support to fabrication/construction group.
•     Spooling of piping isometric drawing for CAD production.
•     Prepare the master schedule from level 2 to level 4
•     Incorporate resource loading based on estimate
•     Prepare data’s for tracking procedure and billing purposes
•     Coordinate the schedule to department/section that are involved to the project

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.