START Date:
August, 2003
END Date:
June, 2005 Scheduled, monitored and inspected all work from start to completion
• Creating programmes at level 1 and 3 to be used to aid design and construction.
• Resource Scheduling producing level 3 manning Requirement throughout the duration of design and thought the construction to aid the term contractor
• Revising network diagrams to be used for construction (using MS Visio)
• Creating Tender programmes to incorporated with Bidding for Contracts
• Creating/Implementing systems and procedures for project management, planning and project control
• Creating programmes at level 1 and 3 to be used to aid design and construction.
• Resource Scheduling producing level 3 manning Requirement throughout the duration of design and thought the construction to aid the term contractor
• Revising network diagrams to be used for construction (using MS Visio)
• Creating Tender programmes to incorporated with Bidding for Contracts
• Creating/Implementing systems and procedures for project management, planning and project control