Tolent Construction Ltd Civil Engineer
START Date:
March, 1999
END Date:
January, 2000 Tolent Construction.
March to July 2000, Senior Engineer,
£4 million Multi-building commercial development.
I was involved in the setting out of pile, bolt boxes and structural steel.
January to March 2000, Senior Engineer,
£750,000 college refurbishment.
I organised temporary works, brickwork and structural steel. Liased closely with structural engineer suggesting details and providing existing levels and dimensions.
June 1999 to January 2000, Senior Engineer,
£6 million cinema development and £750,000 road improvement scheme.
Initially setting out piling, bolt boxes and structural steel I assisted in the management of the off site road improvements including traffic management, utility diversions and surfacing works.
March to June 1999, Senior Engineer,
£250,000 inner city retail development.
I set out brickwork and insitu R.C stairs and generally supervised works.
March to July 2000, Senior Engineer,
£4 million Multi-building commercial development.
I was involved in the setting out of pile, bolt boxes and structural steel.
January to March 2000, Senior Engineer,
£750,000 college refurbishment.
I organised temporary works, brickwork and structural steel. Liased closely with structural engineer suggesting details and providing existing levels and dimensions.
June 1999 to January 2000, Senior Engineer,
£6 million cinema development and £750,000 road improvement scheme.
Initially setting out piling, bolt boxes and structural steel I assisted in the management of the off site road improvements including traffic management, utility diversions and surfacing works.
March to June 1999, Senior Engineer,
£250,000 inner city retail development.
I set out brickwork and insitu R.C stairs and generally supervised works.
- Company:
- Industry:
- Region: