Boyne Smelter Project Controls Engineer
START Date:
April, 2006
END Date:
August, 2007 Worked as a Project Controls Development Engineer. Developed and rolled out Primavera to the Engineering onsite. Also managed the Primavera system and helped plan onsite works. Also developed and utilised other project control system as part of my role.