Planning Engineer, North East Shipbuilders Ltd., (various projects)
Responsible for unit outfit work packages for all production areas. Modular pipe work systems were split into work package information to enable 50 tonne modules of pipe work to be assembled offsite and then be installed as a complete unit. Also 500 tonne accommodation units were work packaged in a similar manner and fabricated on the quayside and lifted upon the vessel as a complete finished unit. Work packaging of this nature was developed during the construction of the I.T.M. "Challenger" which is a 45,000 tonne Crane Ship - the largest of its type in the World. Other duties included calculating planned man-hours per workpackage by applying parameters against workpackage scope. Production of job cards for feedback of workpackage status. Networks were also produced in ARTEMIS 6000 using the Critical Path Analysis Method. Bar charts and Histograms were also produced from Artemis to show the Scheduling of Work packages through the full project life cycle. The requirements of BS 5750 for Quality Control were closely observed.
- Company:
- Industry:
- Job Role:
- Project:
- Region: