Area Planning Engineer., "Mohammad Al Mojil Group ( Jubail City, K.S.A)", Saudi Kayan Petrochemical Complex

START Date: 
December, 2006
END Date: 
March, 2008

SHARQ 3rd Expansion Project
Off site expansion control and planning, ARAMCO standards reflection and time delay and qualified work groups and personnel. (Under MMG)

Saudi-Kayan Petrochemical complex erection
Area 21 (Off Plot) : Pipe line Planning including Port Area Tank Farm Civil work Planning.
Area 22 (Modularization): Structural Work Modularization and Pipe Rack Erection. Electric Cable Pulling and Trench Erection Scheduling.
Area 24 (Utilities) : Civil Work Mechanical Instruments Installation Planning and Pipe Rack Structural and Piping Planning including heavy lift planning (1400 tons boiler and wash tower)
Area 38 (Butane Facilities): ARAMCO Metering Facilities and Shark Leak Detection unit.
Approved schedules and plans from FLOUR international consultants. (Under MMG)
ACICO Computer Company
Description: Controlling the project of software and hard ware maintenance and support as well as installing network system in the Islamic hospital of Tripoli.