Kumagai , Skanska ,HCC Itochu JV Civil Engineer

START Date: 
December, 2002
END Date: 
June, 2005
•     Monitoring & Planning 100 MT Cutting & Bending in Single Shift.
•     Supervision of all activities from receipt to dispatch of Reinforcement.
•     Co-ordination with Quality Control & Client for Quality Assurance & Testing of Materials.
•     Stock Monitoring based on requirement of four sections of MC1A.
•     Production Planning based upon manpower & demand from site during peak time.
•     Checking of Bar Bending Schedule as per Drawing as & when required.
•     Supervision of Construction of Diaphragm Wall Cages, Roof Slab, Concourse Slab & Base Slab by Top-Down Method.
•     Coordination with Quality Department on Quality related issues and with Site Architect for any Site & Design related problems.
•     Monitoring the Progress of Work as per Work Programme Schedule.
•     Measuring the Quantities of Different Items.
•     Coordination with MEP Contractors & Civil Department.
•     Coordination with Architectural Finishing Works Subcontractor such as Stone Works, False Ceiling, Cladding & Glazing, Brick & Block Work, SS Railing, Rendering, different types of Flooring.
•     Monitoring the Works as per Environment & Safety Norms.