Abstract
Resource Allocation is without doubt one of the most important areas of concern to construction management. The two main problems of resource allocation of concern are resource levelling and resource scheduling. The normal convention is for, the resource scheduling problem to be solved using either heuristic methods or optimization techniques. Where heuristic methods are used, resource scheduling is always treated as a subsequent problem for the critical path analysis.