As Technical Asst. to VP-Operations:
Assigned to main office and was task to assist the VP for Operations on the technical aspects of the different works at hand. Company representative for project site visits, pre-bid conferences technical/management meetings and the like. Preparation of bid proposal package for all prospective projects. Preparation of variation/ change order cost proposals for on-going projects. Assigned as Project Engineer for small projects & completed projects under warranty period.
My major accomplishment was I introduced the use software in the company, like using AutoCAD 2000 in preparing shop drawings and construction details instead of the previous manual drafting, and the use of Microsoft Excel in preparing quantity estimates and payrolls.
As Site Project Engineer:
Directing construction / installation of equipment & systems and initiating field modifications for plumbing and fire fighting systems. Preparing cost & quantity estimates. Preparing accomplishment reports including collectibles of sub-contractors. Prepare appropriate reports and documents for management review as required for the following projects:
• Valencia Hills Condominium Project, Quezon City, Philippines
- Federal Land, Inc.
- Plumbing & Fire protection works of high rise residential / commercial condominium
• Robinsons Place Residences Project, Ermita, Manila, Philippines
- Robinsons Land Corporation
- Plumbing & Fire Protection works of High Rise Residential / Commercial Condominium