Diffrence P6 Vs P3

Member for

21 years 8 months

From: http://en.wikipedia.org/wiki/Olfactory_memory



There is also evidence suggesting that there are deficits in olfactory memory in individuals with brain degenerative diseases such as Alzheimer's and Dementia.

Member for

14 years 4 months

seriously..dude yeah p6 sucks if u dont know it..

Member for

24 years 10 months

P6 sucks !

Member for

21 years 8 months

A huge difference might be customer support and quality of the products.

P3 was supported by Primavera a different Company, then the name and the products were acquired by ORACLE. P6 was originally developed by a third company.

P3 was a very stable software and had very few bugs, but by what I have observed here it seems P6 experience is quite different.

For a report on ORACLE customer satisfaction follow the link, then you will be informed and no surprises will be blamed on you if you recommend P6, always make an informed recommendations.

http://podporasap.cz/downloads/Computer_Economics_Oracle_Customer_Surve…

Photobucket

Member for

16 years 2 months

Hi Alexandre,

 

I am trying to import a project done in P3 to P6.7. I dont have P3 installed on my desktop, can I still import P3 on my desktop pc?

Please guide with information, if you can.

 

Best Regards,

Chirag Raval

Member for

14 years 8 months

 HI ALL

 

I AM NEW TO PRIMAVERA. HAve used MS PRoject and have good understanding of Project Management Tools and MEthodologies. HAve completed PMP exam preparation course and worked in CAPEX related projects in Toyota Manufacturing Division for up to 4 years.

I would appreciate if somebody can help me finding a career in Petrochemical / Oil and Gas in Planning / Scheduling / Project Management discispline? Also, I have P6 CD on me but every time I install it, I do not get any success. P6 installation steps are requird too.

 

Thanks and Look fwd to hear from someone soon.

Best regards to all!

Mudassir KHURSHID (Melbourne)

Member for

15 years 4 months

Hi everybody,

 

is there such thing as a comparison that shows the changes between P6v7 and R8? Are there any chnages regarding the client, or did Oracle focus on their fancy web app?


Thank you

Member for

15 years 4 months

Hi everybody,

 

is there such thing as a comparison that shows the changes between P6v7 and R8? Are there any chnages regarding the client, or did Oracle focus on their fancy web app?


Thank you

Member for

20 years 1 month

Dear Ellyn

Can u send me the matrix, i still m working in 6.2.

actually what i m looking for is alrnative names & ways of doing thing, to give u an example Hammock P3 is Level of effort in P6 and so on.

Regards

Sachin. 

Member for

20 years 4 months

P6 is very user friendly, fast and has rich graphics interface when compared to P3. Resources and cost management is very simple and powerful in P6.  

Junaid

Member for

15 years 1 month

Hi Ellyn

How are you doing?

Please can you send me to me the matrix of different P6 and P3?

My email address is SHAMROL@GMAIL.COM

 

Thank you

 

Cheers

Sham Ahmad

Member for

17 years 5 months

HI Ellyn,



Can you please send me also the difference matrix of P3 & P6 at the email sksikka@gmail.com



thanks in advance....



Regards



Sushant

Member for

19 years 10 months

Hi Ellyn



Thanks for that clarification.



Keep on with the good work.



Best regards



Mike Testro

Member for

19 years 10 months

Hi All



make sure that you are not distributing copyright material or i will close the topic.



Best regards



Mike Testro

Member for

17 years 4 months

HI Ellyn,



Can you please send me also the difference matrix of P3 & P6 at the email dsg2723@yahoo.com



tnx in advance....



regards

george

Member for

17 years 6 months

HI Ellyn,



Can you please send the difference matrix of P3 & P6 at the email ajithsreeja@gmail.com



Thanks & Regards

Ajith Kumar

Member for

19 years

what’s about features in P3 not implemented yet in P6 ?

Member for

16 years 10 months

Thanks Ellyn, with deepest respect to you we all know the difference.



However by the time we get to start using P6, Primavera would come out with P7,8,9,10......



I think Primavera is a very powerful software and sensible planners will make the best use of it whatever the version.



Best Regards,

Arjun Thomas.

Member for

19 years

hi



happy to see that you made the switch, and sorry if my writing sounded negative, it was not my aim.



happy planning

Member for

19 years

thanks Ellyn for the files, but to be honest it is more a marketing material then a difference between P6 and P3



best regards

Member for

20 years 4 months

Ellyn,



I appreciate it so much if you have the time to send to me a copy.



email: charlieorbe@gmail.com



Cheers,

Happy Planning and Scheduling

Member for

16 years 10 months

Hi All,



Looks like the difference on P6 vs P3 will go on forever.

Thats a good thing.



However, does P3 have anything better than P6 as well as MS Project?



I think P3 is still the most popular and quite a powerful software with planners due to its simplicity to intall and use. MS Project is also very popular. P6 is yet to catch on. Why?



Thanks and Best Regards,

Arjun Thomas






Member for

16 years 10 months

Please send me a copy too!

Member for

19 years

hI eLLYN

THANK YOU FOR YOUR HELP, AND WELCOM TO OUR PALNET, BELLOW MY PERSONAL EAMIL :

aerski@yahoo.fr



Thanks a lot.

Member for

17 years

I want to add some more since I’m using both versions,

P6 interface is user friendly and very much pratical to use. P6 is a multi project multi user software with outstanding security capabilities, ie you can assign whaty each user can view and edit. P6 uses database, projects share common resources, calendars, codes etc...In P6 you can add a hierarchy for your projects and open, edit and analyze one, two, or even all your projects at the same time. You can add a hierarchy for your organization and assign responsibilities to projects, WBSs and activities. A lot of features exist in P6 like "claim digger" which compares two plans and delivers a very useful report. A lot of attributes are introduced to P6 like "physical percent complete" which measures completion according to one’s perspective and has no effect on actual qtys...what else...in summary, p6 is completely different and i highly recommend it.

Member for

22 years 9 months

Abderrahmane,

these are entirely different peices of software: P3 is a standalone application for a standalone planner, while P6 is a role based project management application

that means that P3 is great at scheduling public works or engineering, oil and gas, ... projects, where the resources are site workers and therefore will not key in any personal data as actual hours, ... into the project file

and P6 is what you need when the resources need to enter their actual hours in electronic timesheets for the planner to automatically update his schedule

P3 was designed to run under MS Windows 3.1 and is still working under Windows Vista! the user interface is quite old looking, but the software is really robust

P6 is much more 21st century looking, with plenty of windows and different screens.

In Algeria, P3 is much more used that P6; I know that Sonatrach is willing to upgrade, but this is a big project.

I am giving training of both P3 and P6 (and P5 too!) in Algeria, and currently planning a large project in Arzew.

bqa 3la kheir,

Alexandre