Resident Enginner, GTME de VENEZUELA, 230 kV transmission line - Morón Coro

START Date
END Date

Resident Engineer for a 230 kV transmission line built for CADAFE (National government electrical company). This transmission line was 120 km in length, had 360 auto-supported towers, and contained a total of 2,000 tons of 3-phase conductors and one OPGW cable all the way. This was a 7 MM USD project constructed in Falcon State, Venezuela, during a 16-month period, and took 480,000 man-hours to complete. All work was done to a high level of Health and Safety and ISO-9001 2000 standards.

CONSTRUCTION MANAGER, Consorcio KCT CUMANA II, EPC - DT 230 kV S/E Guanta II - S/E Casanay - S/E Guiria

START Date
END Date

Consorcio KCT Cumaná II, Sucre State, Venezuela                                                     Aug 2007 – Oct 2008

http://www.planningplanet.com/taxonomy/term/13452/all?page=5

http://www.cielemca.com.ve/

Mechanical Design / Project Engineer, ISEMCA (Installations and Electro-mechanic Service, Various Projects

START Date
END Date

Working as project Engineer in Air Conditioning System Projects, Installations and services, initially assisting part time in the preparation of drawings and preliminary calculations for small projects, and after my graduation being in charge of two areas: installation supervision, supervising 4 technicians for installations and organizing them for different projects, as well as coordinate with the other disciplines related with the installation.

federico brigato

First Name
federico
Last Name
brigato
Professional Since
Oldest experience
Years Experience
0
Telephone Number
+39-3339681514 +39-3420632650