CBS, WBS Integration

A
Ahmad Laji 👤 Member for 24 years 6 months

Dear Fellow planners,

Ive read the forum about WBS/CBS/OBS, i'm now currently doing waterpark project and i got into WBS for this project.

 

I would appreaciated if anyone has sample WBS for my references. my email is [email protected]

We can share knowledge if anything . Thanks

 

Regs,

Matt

M
Mehdi Rashidi Alangeh 👤 Member for 22 years 11 months

Dear ALassam,

Your query is very important in the PM terminology.

In the our countries accounting DEPT is out of PM systems.

We must establish a system for integration between WBS & CBS by localised system.

I want help you for create this system. please contact me with email address [email protected]



B/R

Rashidi

V
Vladimir Liberzon 👤 Member for 25 years 4 months

David,

you don’t need to use WBS codes to create WBS in Spider Project though this package creates WBS codes for any structure if necessary. We always use multiple WBS structures to be able to analyze projects from the different points of view and to get necessary reports.

Usual structures: results, processes, responsibilities, cost accounts, contracts, geography, organizational, etc. Just switch to another (new) WBS, create phases, choose necessary activies, cut them and paste into corresponding phase. Nothing will change in other structures. And you can switch from one WBS to another by the mouse click in the menu Project/WBS.

This feature is very useful.

Vladimir

D
David Watters 👤 Member for 23 years 5 months

Lori



We have a similar problem on our project as well - in the commercial sector. The WBS dictated by the client and used in the schedule to track effort costs through detail design RESULT CBS !



How are you proposing to handle the problem of highlighting the potential pitfalls?



Vladimir - What breakdown do you use for your different WBS codes? I know a few who have sucessfully used this approach in the past for offshore coding issues

V
Vladimir Liberzon 👤 Member for 25 years 4 months

Lori,

why having several breakdowns in one project is considered as a problem. We always use several WBS - result WBS, process WBS, resposibility WBS, and others if necessary. It is a common practice.

L
Lori Frederick, PMP 👤 Member for 22 years

Basil,

I am also interested in an illustration or description of how to integrate the various breakdowns within a project. My client is having a difficult time accepting that their proposed "WBS" is actually a CBS and that, from a schedule management perspective, we will need to have two realted, yet different breakdowns. (This is a major US govt agency and I am surprised at their reaction)



lori pierce

[email protected]

F
Forum Guest 👤 Member for 17 years 4 months

For Mr. Dragos Daescu

Thanks a Lot for this web site but i know this site and it is very useful but do not have what i need exactly.

Sincerely Your

Dipl.Eng- ALassam Ghanem

F
Forum Guest 👤 Member for 17 years 4 months

For Mr. Emre Bayrak

This is an Artical Speaks about the Integration about CBS and WBS and OBS.

[William J. Rasdorf and Osama Y. abudayyeh, (1991) "Cost- and Schedule-Control Integration: Issues and Needs" ASCE, 117(3), 486-502].

i do not have an electronic copy, so you can find it in the Magazine of construction and engineering and management.

Sincerely Your

Dipl.Eng- ALassam Ghanem

L
Luca Basile 👤 Member for 22 years 11 months

Give a look at APEX project.

Is given with P3, in the same CD.

Is a pretty good example of integration Wbs/Cbs and Obs.

E
Emre Bayrak 👤 Member for 23 years 1 month

Hi

I also need some help on the issue you discussed.Can you also send me these slides or can you give any referance about ’3D system’ you told ?

Thanks

Emre

[email protected]

L
Luca Basile 👤 Member for 22 years 11 months

You are welcome.

This one I found in the net, I just modify a little and put the animation to better use for trainning.I have done a lot of others, on different topics. At the moment I have just sent You the other two.



Luca

A
ALassam Ghanem 👤 Member for 22 years

Thanks a lot Dear Sir

I Received your slide and i found it very important and useful, i hope to receive the others, so i freed my mail box and i have another one: [email protected]

Sincerely Your

Dipl.Eng- ALassam Ghanem

L
Luca Basile 👤 Member for 22 years 11 months

I sent You an email with a slide.

I try to send other 2 slides, but You email box was full.

When You will free it,let me know and I will send the other two.


A
ALassam Ghanem 👤 Member for 22 years

Dear Sir Thanks for your reply.

I searched in Googel But I did not find any free web site or books, so i will be very thankful if you help me in finding some information about this topic.

sincerely your

Dipl.Eng- ALassam Ghanem



E-mail: [email protected]

L
Luca Basile 👤 Member for 22 years 11 months

An integrated WBS/CBS/OBS is one of the requirement also to establish an EV management.

The intersection of this will give You the accounts.

Looking at them You can find out where the project is going bad or well, identify the reason and address all this to the right person.

The intersection of the three is giving a 3D model.

Or if taken two by two a matrix system.

I try to be as much as possible short as You can find a lot of good references around the net as well as good books on the issue. Just run a search on gogle.

Or send me Your email address and I can address You to some material more dedicate.

Forum Sponsor

Top Posters

anwar zeb
1 posts
olva seselima
1 posts
Muhammd Muneer
0 posts
sairam
0 posts
MARAT BILYALOV
0 posts
RichTea66
0 posts
Muneer Muhammad
1 posts
Manny Onifade
5 posts
Hunais M J
0 posts
Soheil Barekat
4 posts