Thanks everyone for your replies i got it fixed. the replies really helped me to fix it. Thanks everyone......

G
Gerry Ampo 👤 Member for 18 years 3 months

Hello Aloke,



Can you try to check the Start Point type and Finish Point type in your Target Bar Structure? There might be a chance that instead of Putting the "Target 1 early start" and the "Target 1 early finish" respectively, the "early start" and the "early finish" type was installed.

M
Muhammad Waseem, PMP 👤 Member for 19 years 6 months

I think you are need to define the bars properly, there is a chance that you mihgt not have check target bar in the bars setting dialog box. Otherwise there is no other setting as will move the target bar along with actuals if u have properly asigned the target to your project in Tools>Project utilities>Target.

Forum Sponsor

Top Posters

Dimitrios Theocharidis
3 posts
MichaelFuelsC
0 posts
anwar zeb
1 posts
olva seselima
1 posts
Muhammd Muneer
0 posts
sairam
0 posts
MARAT BILYALOV
0 posts
RichTea66
0 posts
Muneer Muhammad
1 posts
Manny Onifade
5 posts