Is the activity resource-driving if it is leveled?
Forum Sponsor
Top Posters
Dimitrios Theocharidis
3 posts
MichaelFuelsC
0 posts
anwar zeb
1 posts
olva seselima
1 posts
Muhammd Muneer
0 posts
sairam
0 posts
MARAT BILYALOV
0 posts
RichTea66
0 posts
Muneer Muhammad
1 posts
Manny Onifade
5 posts
Hi sum and Mike
First of all leveling is done when one or more resource is excessively required but not continuously. I think we have to make resource driven / specify available limits so that P3 can reschedule the non critical activities within the allowable lag respecting their relationship.
Hope my understanding is right though I have not practically done it.
Im not an expert with resource leveling. I think you are referring to whether the "driving" checkbox in the "cost tab" must be selected if you want to level the resources for the schedule, including the ones in that activity.
Can somebody provide a little more focus on this? Or am I overcomplicating the question?