% Complete difference

J
Jerome Odeh 👤 Member for 22 years 4 months
J
Jerome Odeh 👤 Member for 22 years 4 months

Thanks Dgd.........I just ran a detailed Cost Report from Tools>Tabular Reports>Cost>Control and it painted the picture I wanted to see.......





And to Harris...I’ve been using your P3 book since december and I’ve found it invaluable......thanks.

J
Jerome Odeh 👤 Member for 22 years 4 months

Thanks the replies but my question is all about the Schedule Command Report.



I’d like the Schedule Command Report % Complete to be same with the Project % Complete displayed on the % column when % complete weighting is based on cost and not duration.



For now, I’m disregarding it like Dgd suggested but I’m a bit curious about this.

P
Paul Harris 👤 Member for 25 years 2 months

The help file states that the Schedule report is summarized using the options selected in Tools, Schedule, Options, Summarization, so in theory you are doing the correct thing.



I have found in the past to make one report run correctly I had to recalculate twice! I do not recall which.



You may wish to take this issue up with Primavera technical support, but I feel you are doing the correct thing.



You may wish to create a new schedule with say two or three activities, where it would be simple to calculate the results by manually, and check if the report still runs incorrectly.



Paul E Harris

Eastwood Harris Pty Ltd

Planning and Scheduling Book Publishers

www.eh.com.au

Forum Sponsor

Top Posters

MichaelFuelsC
0 posts
anwar zeb
1 posts
olva seselima
1 posts
Muhammd Muneer
0 posts
sairam
0 posts
MARAT BILYALOV
0 posts
RichTea66
0 posts
Muneer Muhammad
1 posts
Manny Onifade
5 posts
Hunais M J
0 posts