Wrong EF date

A
Ahamed Shabeer 👤 Member for 21 years 3 months

I don’t have a constraint and milestone. But when I copied the whole program and worked in another system it works perfectly, but with february 1 as data date instead of March 1 which was set in my first PC

P
Philip Jonker 👤 Member for 21 years 7 months

Hi Jaco,

I was of for a while bit of a meduical problem, not serious.



What I am thinking is what you are saying, otherwise with milestones that are not correcrly set, you sometimes get this problem. Another one is Sundaram’s suggestion that the problem might be a sub-project that has an earlier data date.

I had a problem the first time I ran P3 under Windows XP, but it was not this problem. I know there is a patch for XP.





Regards,



Philip.

J
Jaco Stadler 👤 Member for 21 years 9 months

What is your late dates.

What is the TF. (Negative)

As Philip has adviced this probable mean you have a constraint what your logic is pushing but due to the constraint it has to take up the time some how remember it is only a program



Hi Philip welcome back long time.



Cheers

S
Sundaram Arunan 👤 Member for 22 years 9 months

I have checked in one of my schedule which gives correct result.



For your problem i think it may be due to any other subproject id which might have been linked with this current project schedule


Forum Sponsor

Top Posters

Dimitrios Theocharidis
3 posts
MichaelFuelsC
0 posts
anwar zeb
1 posts
olva seselima
1 posts
Muhammd Muneer
0 posts
sairam
0 posts
MARAT BILYALOV
0 posts
RichTea66
0 posts
Muneer Muhammad
1 posts
Manny Onifade
5 posts