How to define "Recovery Schedule" ?
Forum Sponsor
Top Posters
Dimitrios Theocharidis
3 posts
MichaelFuelsC
0 posts
anwar zeb
1 posts
olva seselima
1 posts
Muhammd Muneer
0 posts
sairam
0 posts
MARAT BILYALOV
0 posts
RichTea66
0 posts
Muneer Muhammad
1 posts
Manny Onifade
5 posts
Hi Irfan
Herez how I make it
1. Take a copy of latest updated prog
2. This prog is delayed prog, plse put your recovery finish date, as a must fish by date, to project finish
3. Now filter for longest path
4. Analyse the path and shorten the path by 1. reducing rem dur of in progress 2. reducing Org dur of not started
3. Changing the logics 4. changing calendar etc
5. Do this and filter for next longest path and shorten it
6. At last you will match with the recovery finish date
Regards
Vikas Viswam
Hi Irfan
Adjust logic
Increase resources
change calendar
change work pattern
It is all set out in more detail in the forum plus all the other things that you have to take into account - so do your own research please.
Best regards
Mike Testro
thanks for reply,
but tell me a basic way to prepare Recovery Schedule.
thanks
Hi Irfan
There have been many discussions on this topic on PP - use the search facility and you will get all the advice you will need.
Best regards
Mike Testro