By elimiation, would you mind do some tests: -

- Export P3e/c to P3 and then import the output back to P3e/c without modification. (To identify and problem on P3e/c import/export function)

- Export to P3, open P3, any problem (Check is export file is OK)

- Export to P3, open P3, close without modification, import to P3e/c (check P3 software is problem source)

- Export to P3, open P3, close with modification, import to P3e/c (check P3 software is problem source)



The above test are on two machines, one P3e/c, one P3. Check the finding. Then cross machines.

M
MK TSE 👤 Member for 24 years 3 months

Chris, may I know what error message or incorrect result you client have?

R
Ronald Winter 👤 Member for 23 years 5 months

Owners of P3e can import and convert P3 schedules into P3e schedules. Have them open P3e and then select File / Import. The rest of the steps are explained in the manual and in the help file. (For the record, P3 cannot import P3e schedules. You have to ask the P3e Owner to export to P3 first.) Good luck!



Ron Winter.

Forum Sponsor

Top Posters

Dimitrios Theocharidis
3 posts
MichaelFuelsC
0 posts
anwar zeb
1 posts
olva seselima
1 posts
Muhammd Muneer
0 posts
sairam
0 posts
MARAT BILYALOV
0 posts
RichTea66
0 posts
Muneer Muhammad
1 posts
Manny Onifade
5 posts